Laserfiche WebLink
FEE-16-1996 17:01 TKDR 612 292 0083 <br />6UUPg4 LS. 111 L11U S!] UgpCp, LLLC uC q1,l LVa qll laon IIILL CIb IJG <br />determined by comparison of the project to the threshold <br />specified in the applicable subpart, and the RGU must be the <br />governmental unit assigned by that subpart. <br />Subp. 15. Air pollution. Items A and B designate the RGU <br />for the type of project listed: <br />A. For construction of a stationary source facility <br />that generates 100 tons or more per year of any single air <br />pollutant after installation of air pollution control equipment, <br />the PCA shall be the RGU. <br />B. For construction of a new parking facility for <br />2,000 or more vehicles, the PCA shall be the RGU, except that <br />this category does not apply to any parking, facility which is <br />part of a project reviewed pursuant to part 4410.4300, subpart <br />14, 19, 32, or 34, or part 4410.4400, subpart 11, 14, 21, or 22. <br />Suhp. 16. Hazardous waste. Items A to D designate the RGU <br />for the type of project listed: <br />A. For construction or expansion of a hazardous waste <br />disposal facility, the PCA shall be the RGU. <br />B. For construction of a hazardous waste processing <br />facility with a capacity of 1,000 or more kilograms per month, <br />the PCA shall be the RGU. <br />C. For expansion of a hazardous waste processing <br />facility that increases its capacity by ten percent or more, the <br />PCA shall be the RGU. <br />D. For construction or expansion or a facility that <br />sells hazardous waste storage services to generators other than <br />the owner and operator of the facility or construction of a <br />facility at which a generator's own hazardous wastes will be <br />stored for a time period in excess of 90 days, if the facility <br />is located in a water -related land use management district, or <br />in an area characterized by soluble bedrock, the PCA shall be <br />the RGU. <br />Subp. 17. Solid waste. For the type of project listed in <br />items A to F, -Ulle-PCA is t RGU unless the project will be <br />constructed within the seven -county Twin Cities metropolitan <br />area, in which case the Metropolitan Council is the RGU. <br />A. Construction of a mixed municipal solid waste <br />disposal facility for up to 100,000 cubic yards of waste fill <br />per year. <br />B. Expansion by 25 percent or more of previous <br />capacity of a mixed municipal solid waste disposal facility for <br />up to 100,000 cubic yards of waste till per year. <br />C. Construction or expansion of a mixed municipal <br />solid waste transfer station for 300,000 or more cubic yards per <br />year. <br />D. Construction or expansion of a mixed municipal <br />solid waste energy recovery facility or incinerator, or the <br />utilization of an existing facility for the combustion of mixed <br />52 MA OA TMR <br />P.05i11 <br />