Laserfiche WebLink
MAC/COUNCIL MEETING MINUTES JULY 1, 1996 2 <br />The preliminary schedule for the plan was reviewed. <br />Dean Johnson opened the meeting for discussion. <br />Lee Hunt: 1. access to the site, 2. security, the storage areas <br />Dan felt he should be consulted on this issue. <br />Bill Wacker questioned the usable land area. With the present plan, it is 10 acres, moving the storage <br />area; it reduces the acreage to seven acres. <br />Steve DeLapp asked if the offices could be shifted to the north side of the building. <br />Dick Johnson questioned the size of the building from the original plan. Steve DeLapp stated that <br />through his review of the plan, the building size has increased. Lee Hunt added that the difference <br />between cold storage $29.00 per sq.ft. wasn't that much of a difference because of the size. <br />Lee Hunt felt that two buildings may not be very wise. $45,000. <br />Dick Gustafson felt the landscaping could be done more reasonable by the City, <br />Bill Wacker: Public Works doing as much earthwork as they can. Availability of work. Bearing wall in the <br />building could be constructed later. The City will have more changes. Agrees with Dick Johnson on the <br />Friedrich site. Steve DeLapp agrees with Rita Conlin on the site plan. <br />Dick Johnson: Looks good for convenience, but not for taxpayers. Some mechanical elements were <br />questioned. <br />Wyn John felt that the City made the commitment by purchasing the site. <br />Lee Hunt knows that the City was in an emergency mode. Had to vacate the site. He felt that the <br />Friedrich site is not an option. For the public good. Look at other sites in a short period of time. <br />Onno VanDemmeltraadt:You may come up with another option. <br />Financing was discussed. <br />Dean Johnson: Has a clear direction on this site, but what about the Friedrich site or other sites. Mayor <br />John felt that each site would need to be evaluated at a cost of $10,000. <br />Changes in Sites: Only Options <br />$50,000 to $300,000 Earthwork low $50,00- up to $200,000 <br />Landscape and planting $100,000 <br />Location changes may only allow a 20% change in costs. <br />Richard Gustafson - soil borings? <br />Dean Johnson: does not know, may be able to create a "borrow" pit. <br />Dick Johnson:agrees with DeLapp about number of windows being reduced. <br />Lee Hunt: May be its time to have design meeting. <br />Can Dean proceed wtih site design? <br />