My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#08 - Stillwater Area School DIst Utility Improvements (1)
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
05-20-25
>
#08 - Stillwater Area School DIst Utility Improvements (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:45:23 AM
Creation date
8/15/2025 9:45:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STAFF REPORT <br />DATE: May 20, 2025 <br /> REGULAR <br /> <br />TO: City Council <br />FROM: Chad Isakson, Assistant City Engineer <br />AGENDA ITEM: Approve Resolution Accepting Bids and Awarding a Contract for the <br />Stillwater Area School District Utility Improvements <br />REVIEWED BY: Nicole Miller, City Administrator <br /> Clarissa Hadler, Finance Director <br /> Marty Powers, Public Works Director <br /> Nate Stanley, City Engineer <br /> <br /> <br />CORE STRATEGIES: <br /> <br />☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services <br />☒ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future <br />☒ Managed Growth ☒ Resilient Infrastructure <br /> <br /> <br />BACKGROUND: On April 1, 2025 the City Council ordered an advertisement for bids for the Stillwater <br />Area School District Utility Improvements. The project was advertised on QuestCDN.com and in the <br />Stillwater Gazette in accordance with the Minnesota Competitive Bidding requirements. <br /> <br />ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a construction contract for <br />the project? <br /> <br />PROPOSAL DETAILS/ANALYSIS: The Stillwater Area School District Utility Improvements include <br />the extension of City utilities to accommodate the requested connection to city water and sanitary sewer for <br />the Oak-Land Middle School and new Elementary School. There is one additional property located at 11817 <br />10th Street North that will benefit. The improvements include the following: <br /> <br />• Extension of gravity sanitary sewer to the Oakland Middle School property, from the existing Royal <br />Golf Club lift station located at Palmer Drive and 10th Street (to be City owned/maintained). <br />• Extension of 12-inch watermain to the Oakland Middle School property, from the intersection of Palmer <br />Drive and 10th Street (to be City owned/maintained). <br />• Construction of a new 4,200 LF, 8-inch forcemain along 10th Street, from the existing RGC lift station <br />located at Palmer Drive to Lake Elmo Avenue. Abandon the existing 6-inch forcemain in place. <br />• Construction of a new 3,100 LF, 10-inch forcemain along Lake Elmo Avenue, from 10th Street to an <br />existing gravity sewer at Lake Elmo Avenue and 5th Street. <br />• The school district would be required to make private utility extensions on each school site as needed <br />to connect to the public water and sewer improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.