STAFF REPORT <br />DATE: March 7th 2023 <br /> Regular <br /> <br />AGENDA ITEM: Approve Plans and Specifications and Ordering Advertisement for Bids for <br />Tablyn and Pebble Park Court Improvements <br />SUBMITTED BY: Adam Swanepoel, Assistant Public Works Director <br />REVIEWED BY: Marty Powers, Public Works Director <br />Kristina Handt, City Administrator <br /> <br /> <br /> <br /> <br />BACKGROUND: <br />The City of Lake Elmo Parks Commission has recommended improvements to the tennis courts at Tablyn <br />and Pebble Park. With the increased use of pickle ball courts in Ivywood and Lions Park additional funds <br />were placed into the CIP in 2022 to update the tennis courts at both locations. The current age of the <br />courts are from 2006 and 2009 when new asphalt was applied and resurfaced. Due to recent trend and <br />local interest, it was recommended both tennis court areas be turned into multi-use courts to include both <br />pickle ball and tennis. The current proposal was the placement of four pickle ball courts and one tennis <br />court at Tablyn Park and six pickle ball and one tennis court at Pebble Park. <br />Due to the condition of both courts it was recommended to replace the base and subbase materials. This <br />will assure a quality outcome of the project which will prolong the use of the playing surface. <br />ISSUE BEFORE COUNCIL: <br /> <br /> Should the City Council approve the Plans and Specifications and Order the Advertisement for Bids for <br />the Tablyn and Pebble Park Court Improvements? <br /> <br />PROPOSAL DETAILS/ANALYSIS: <br /> <br />The plans and specifications have been completed for the improvements and are ready to be advertised for <br />contractor bids. A bid date has been scheduled for March 10th 2023. Contractor bids will be opened and <br />reviewed by staff on March 31, 2023. Information will then be presented to Parks Commission for <br />recommendation to Council on April 17th 2023 meeting. Council will review the Parks Commissions <br />recommendation at the May 2nd meeting where the council will be asked to consider and award the contract. <br /> <br />The Tablyn and Pebble Park Courts improvement project includes removal of all playing surface and sub <br />soils up to 24”. This will minimize cracking and heaving of the playing surface which will lengthen the <br />overall lifespan of the playing surface. The new playing surface will consist of 3” of compacted asphalt and <br />four layers of acrylic surface and coating. The color and lining of the courts will be chosen to meet all <br />current standards to both tennis and pickle ball players. <br /> <br />The proposed improvements also include adding two benches outside of each court and installing a 10X12 <br />rebound wall inside of each fenced area. In addition, staff has recommended a 45 FT asphalt trail which <br />would provide access to the Pebble Park court from the parking lot. This will assist in making the area ADA <br />compliant in the future, as well as better accessibility for all users to the playing area.