Laserfiche WebLink
3.5 Materials Ownership — All materials placed for collection shall be owned by and the responsibility of <br />the occupants of residential properties until the Contractor handles them. Upon collection of the <br />containers and recyclable materials by the Contractor, the recyclable materials become the property <br />and responsibility of the Contractor. <br />3.6 Containers Handling — Handling of containers should be managed by picking them up, emptyinit <br />their contents into the collection vehicles, and taking responsible care to place them back in the <br />original location. <br />3.7 Procedure for Unacceptable Recyclables - If the.Contractor determines that a resident has set out <br />unacceptable recyclables, the driver shall use the following procedures: <br />1 Curbside: Contractor shall leave the unacceptable recyclables and leave' an <br />94 education tag" indicating acceptable materials and the proper method of <br />preparation. If the unacceptable recyclables have been tipped into the collection <br />truck, the driver shall record the address of the stop. The Contractor shall send a <br />letter to the resident noting the unacceptable recyclables and providing <br />information on what are accepted recyclables. The address shall be recorded on <br />a form acceptable to the City. Contractor shall report the addresses which set out <br />unacceptable materials and have been sent letters to the City. Recycling <br />Coordinator at the end of each month. <br />2. Multiple -Unit Dwellings: Contaminated carts or dumpsters of material will not be <br />collected. It will be the responsibility of the Contractor to encourage cooperation <br />from the building owner/manager in removal of trash and separation of <br />acceptable materials so that the carts can be serviced. The Contractor shall <br />notify the property manager of problems and make attempts to address the <br />issues. Should the property manager or tenants be unresponsive or refuse to <br />cooperate, the Contractor will be responsible for notifying the City so that the City <br />can take any necessary steps* to enforce compliance. <br />3.8 Missed Collecitions — The Contractor shall have a duty to pick up missed collections. FTYlissed <br />collections called in before 12 pm on the collection day will be collected that day. Calls after 12 pm <br />will be collected before 4 pm.on the following day. Missed collections called in before 11 am on the <br />day after collections will be collection that day before 4 pm. Calls received after 11 am will be <br />collecte••-•-4• on the following business day. The same policy will apply for missed <br />collections called in two days or more after collection. Calls for missed service are either customer <br />calls made directly to the Contractor or customer calls relayed to the Contractor by the City. <br />PAGE 4 OF 13 <br />