My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2014
Lauderdale
>
City Council
>
City Council Meeting Packets
>
2014
>
09/23/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2015 1:09:06 PM
Creation date
7/24/2015 12:59:42 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Meeting Date
9/23/2014
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Collectionvehicles will be weighed after completion of a route or at the end of the <br />day, whichever occurs first. A copy of each weight ticket shall be included as part <br />of the billing sent to the City each month. <br />3. The Contractor will also include a report of the total tons collected, including <br />estimated amounts of each type of material delivered to each market. <br />4. The Contractor will also report amount and location of all materials stored for <br />more than 30 days. <br />3.11 Compliance — Collection and transportation of all recyclables shall be accomplished in accordance <br />with <br />I:. existing laws and ordinances, and future amendments thereto, of the State of Minnesota and <br />local governing bodies. <br />3.12 Collection Clean=ups — Contractor shall adequately clean up any material spilled or blown during <br />the course of collection and/or haulin ' g operations including leakage from the truck operations. All <br />collection vehicles shall be equipped with at least one broom and one shovel for use in cleaning <br />material spillage. The contractor shall have no responsibility to remove or clean up any items whic <br />are not recyclable materials or were blown or fell from the containers before anival. <br />3.13 Resident Complaints — The Contractor shall provide the City with a list of all customer complain <br />received within ten (10) working days, including a description of -how each was resolved. <br />PAGE 5 OF 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.