Laserfiche WebLink
<br /> <br />I <br /> <br />1,. <br />T <br />I <br />-r~ ~" <br />I' <br /> <br />I <br /> <br />The total runoff equivalent shall be the sum of the products <br />of the appropriate coefficients of runoff and the square <br />feet of area of each type of eXisting or propose<l land use, .. <br />on the parcel of land. . <br /> <br />Subdivision 5. Credits~ <br /> <br />I; <br /> <br />d. Any special assessments specifically levied against <br />a parcel of land for storm drainage ~runk ~ystem <br />lmprovements may be credited against the required <br />SDN Charge for that parcel. <br /> <br />! ' <br /> <br />25.06 <br /> <br />b. Any payment of a SDM Charge, as required herein, <br />shall be cledited against any future special assess- <br />ment for storm drainage trunk system improvements. <br /> <br />USE OF FUND. <br /> <br />~ <br /> <br />. <br /> <br />noy SuM Charge payments deposited in the Fund shall be used <br />only for expenses incurred in the design, construction, or <br />improvement of City storm drainage syst~ms. These expenses <br />shall inClUde, but shall not be limited to, acquisition of <br />land and easements, construction of water quality control <br />improvements, and debt retirement in connection with storm <br />drainage system improvements. <br /> <br />J: <br /> <br />1: <br />r <br />i <br /> <br />25.07 Tfu1NSFER OF FUNDS. <br /> <br />Any SD,., Charge payments deposi'ed in the FUnd shall not be, <br />- transferred out of tht:! FUnd eXr~ept for the purposes enumerated <br />In Chapter 25.06 above. <br /> <br />. <br /> <br />