Laserfiche WebLink
MOUNDS VIEW CITY COUNCIL Regular Meeting <br />Page 3 January 14, 1980 <br />Dan Boxrud of S.E.H. explained the 7. SILVER LAKE ROAD <br />proposed installation of water services IMPROVEMENTS <br />(Project 80 -1) and possible methods of <br />financing. <br />Walter Skiba, 7841 Silver Lake Road, <br />pointed out a possible problem since the <br />apartments have paid for improvements in <br />the past. Attorney Meyers explained that <br />anyone previously assessed may be due a <br />credit, should the project go through. <br />A discussion took place regarding whether <br />the system would provide adequate fire <br />protection. The Fire Marshal has pre- <br />viously indicated it would not. <br />Glenn Karlen, affected property owner, <br />wants the improvements, but not at $66 <br />per sq. ft. Genevieve Dahlberg, 8605 <br />Baltimore St., affected property owner, <br />felt it was time for the lots to be <br />developed,'; but thought the cost sounded <br />rather unreasonable. Mrs. Hansen, 7767 <br />Groveland, feels that since her lot is <br />83' <br />wide—too narrow to build double <br />dwellings similar to those around her and <br />not desirable to build a single family next <br />to double dwelling+ -it may be unmarketable <br />and therefore not worth the high cost of <br />water installation. Craig Zuidema, 2809 <br />County Road I, does not want and would <br />not accept the $66 /sq. ft. assessment- <br />he has recently dug a new well. <br />The Mayor closed the Public Hearing and re- <br />opened the Regular Meeting at 9:00 PM. <br />McCarty moved to deny Project 60 -1 because <br />it is not economically feasible. It was <br />seconded by Ziebarth. <br />The motion carried. <br />5 ayes <br />0 nays <br />Ziebarth moved that this water improvement <br />project be considered for the Capital <br />Improvement plan when it is considered. <br />It was seconded by McCarty. <br />4 ayes <br />The motion carried. 1 nay <br />(Nay vote: Hodges) <br />Repair of Silver Lake Road has been <br />delayed because of recent cold weather. <br />A 2 ft. settlement of the pipe has been <br />found. The City will clean out the main <br />and determine the damage. <br />9. ENGINEER'S REPORT <br />