My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1998
>
1998 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2018 10:25:19 AM
Creation date
2/22/2012 8:14:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
882
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�i <br />� <br />I�/ioureds Vi�w �lans�Yn� Com�reissa�r� Aprii 1, 199� <br />1�e �lar I�/ie�tin �� e �3 <br />The floor was retumed fio the Commission for questions and cornmenis. <br />Com�essioner° .Tohnston asked staff if ihe MnDOT approval of the associated traf�ic <br />signal depends on the reatignment oiEdgewoad Road and i�'so how close ��ld the <br />realignment come to City Hall. � ,;�, <br />'`>'�,. <br />I)rrector Jopi�e told the Commission the reali�n <br />projeci at this point in time. He gave no specific <br />The floor was turned over ta the applicant for <br />�era�ell Ssnith showed the Commission an <br />facitities. He told the Commission that the c <br />i� part of the <br />; of the proposed <br />has been selected. <br />Th� changes that have been made frocn the o����� site, ae�cfi;�� ���s��ted by Director <br />Jopke, were reviewed. No access on io �tiitr��.o�d ��2 or �,�s����ake Road has been <br />designed into the project. This desi ��mer�� ��� � t��ect re, ��i' of working with the <br />neighborhood that had made ii kn � from e�f} oxt �i� ���7�� ct that they did not wa�t <br />the iheater to impact the traffic ;< ng throug�i the�r »�zg�%�irhood. <br />:� .M <br />� `"" y '- <br />The Fire 1Vlarshal's reques����: deR th� cility en �s will be accommodated. These plan <br />changes will be made av��` �'�e at the ��t P1ant� Commission meeting. <br />� <br />� <br />�f�� ��������+�:�e�r expre�s�tiy ��'eir concem that the City has not been given <br />ce from _%�Qr`�'>,<that the t`rafi5c intersections involved with the project have <br />��,for cott�'��c��trs�� ,,They requested that the applican� f�rnish an ofiicial <br />�'���t.�VinDQ"1=�f. �1�e �ril 1S, 1998 Ptanning Commission meeting. <br />Th��iirre�zt pia� sk��i�vs a sidedialk coming from Long Lake Road to the facility entrance <br />���� also from L�ng'�a�.� �ver to Highway 10 tha� would connect. Siaff feels that they <br />�would prefer to �I�tn�ria,tc the Long Lake Road to the faciiity enirance sidewalk and have a <br />bituminous path.��stead. This change will be shown on all future drawings. <br />� <br />iew was given by $ri�'� �Ie�nd�toek, of SEI, the consulting <br />for the project. <br />Ie�c?���t�l,.���ri�� Brasaemle/Stevenson to continu� the Planning Commission regular meeting of <br />Aprii I, 1998 beyond the 11:00 p,m. c�atoff point. <br />Ayes - 6 <br />j The motion carried. <br />IVays - 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.