My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1998
>
1998 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2018 10:25:19 AM
Creation date
2/22/2012 8:14:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
882
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�:. <br />tr- <br />BENSH40F & ASSOCIATES-, INC. <br />TRANSPORTATION ENGINEERS AND PLANNERS , <br />7301 OHMS LANE, SUITE 500 / EDINA, MN 55439 /(612) 832-9$58 / FAX (612) 832-9564 <br />January 27, 1997 <br />MEMORA.NDUIVI <br />TO: Robert Cunrungha�, TOLD Development Co. <br />FROM: James A. Bensholof & Michael H. Chen titi�� <br />Refer to File: 97-89 <br />,���JL'� � <br />� � � �' ti �`��'�3 <br />r-�, n �, <br />�'�v�-�--r�---� <br />RE: Traffic Impact Analysis Results for Walgreens Store in Mounds View <br />PURPOSE <br />As requested by the TOLD Development Company, this memorandum presents the results of <br />our detailed traffic review that was completed for the planned Walgreens store located in the <br />City of Mounds View, Minnesota. <br />The analysis year for this development traffic study has been set at 1999. The Walgreens store <br />is expected to be completed in the Fall of 1998 and the analysis examines the impacts one year <br />after completion, which is consistent with State environmental regulations. The analysis <br />address tr�c implications of the Walgreens development during the p.m. peak hour, the time <br />when volumes on the adjacent roadways are at their highest. Additionally, an analysis of the <br />neighborhood impacts caused by the closing of Eastwood Drive at County Road I was also <br />completed. <br />In order to accomplish this year 1999 traf�ic analysis, we have accomplished the following <br />work tasks: <br />l. Collection of background data. Information was collected from the City of Mounds <br />View, TOLD Development Company and actual field observations and surveys. Third <br />parties such as the Police Department, the Fire Department and the School District <br />were contacted regarding the closure of Eastwood Drive. <br />Z. Development of Trat'fic Forecasts. Trai�c forecasts were developed to account for <br />the new Walgreens store. Turn movement projections were devefoped for the p.m. <br />peak hour at the proposed right turn access location along T.H. 10, at the intersection <br />of T.H. 10 and County Road I, and at the proposed full access point on County Road I. <br />Forecasts determining the impact of closing Eastwood Drive at County Road I on the <br />neighborhood to the north were also developed. Daily traf�c projections were <br />
The URL can be used to link to this page
Your browser does not support the video tag.