My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-1996 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
1990-1999
>
1996
>
09-09-1996 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 6:52:44 AM
Creation date
3/13/2012 12:49:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
1/1/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ _. _ <br />Inspections and Final Grade/Fillin� <br />The entire site shall be finished to a uniform grade. Excess earth on the site may be used to fill <br />any excavations or depressions. The contractor shall bring in suitable fill if on-site material is not <br />adequate. No debris shall be placed as fill on the site. The contractor shall take such measures as <br />may be necessary to control dust on the site during the duration of the contract. <br />The contractors must call for an inspection by the City Building Inspector prior to any back-fill of <br />excavations. Failure to do so will result in re-excavation at no additional compensation. <br />Default and Cancellation <br />In the event that any of the provision of the specifications are violated by the contractor, the <br />Mounds View EDA may terminate the contract by written notice to the contractor. In such <br />event, the EDA may take over the work and prosecute same to completion, and the contractor <br />shall be liable to the EDA for any excess cost occasioned by the EDA thereby. <br />Completion of Work <br />All work must be completed by September 20, 1996. At the discretion of the Mounds View <br />EDA, a reasonable extension of time may be granted if such extension is in the interest of the City <br />or if conditions of weather appear to warrant such an extension. <br />Payment <br />Payment to the contractor will be made upon satisfactory completion of this contract as <br />determined by the Executive Director of the Economic Development Authority. <br />
The URL can be used to link to this page
Your browser does not support the video tag.