My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-1996 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
1990-1999
>
1996
>
09-09-1996 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 6:52:44 AM
Creation date
3/13/2012 12:49:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
1/1/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ _ _ :_.. <br />,. <br />Disconnection of Utilities <br />_ __________ <br />The contractor shall be responsible for the disconnection of all utilities. The sanitary sewer sha11 <br />be capped at the property line with a permanent watertight cap or plug. The water services shall <br />be disconnected at the curb stop. For further specifications on utility disconnections, please call <br />784-3055. Water and sewer disconnects must be done by a licensed contractor. Permits will be <br />required for disconnects. Disconnection of all utility services to the site shall be the first order of <br />work. Demolition may not commence until the utility services have been disconnected and a <br />demolition permit has been obtained. <br />Indemnity and Insurance <br />The demolition and clearing of the site shall be carried out in such a manner to preclude damage <br />to adjacent property. The contractor must agree to hold harmless the City of Mounds View, the <br />Mounds View Economic Development Authority, and their respective employees from any claims <br />for damages resulting from any work performed under this contract. <br />The contractor shall carry not less than $500,000 in public liability insurance and not less than <br />$100,000 in property damage insurance naming the City as an additional insured and agrees to <br />assume all liabilities for any act or deed of said contractor or sub-contractor and shall save the <br />City harmless against any and all suits, actions or claims brought on through any work under the <br />performance of this contract. A certificate of insurance shall be provided at the time of license <br />approval and permit application. <br />The contractor shall erect and maintain all necessary barricades and warning to adequately <br />safeguard the public and workers. <br />Notice to Citv <br />The contractor shall notify the 7ennifer Bergman, Mounds View staff, two days prior to the <br />commencement of demolition worlc. <br />Removal of Materials from Site <br />All salvage materials and/or debris remaining in the building and on the grounds of the site shall be <br />the property of the contractor and removed from the premises and shall not be stored, burned or <br />buried on the site. <br />The contractor shall completely remove all building materials and debris from the site including all <br />concrete sidewalks, footings, floors on grade and below grade, foundations, curbing, driveway <br />and parking lot areas, unless otherwise specified. No burial of materials will be permitted on the <br />site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.