Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />8. Redo Silver View Ball Field No.1 and warning track. DO ~N 21005 <br /> <br />9. Install Sidewalk 8' from Hillview Road to Hillview Park Shelter front <br />door. DO iN 2005 (Tlhis wm /ble c(Qros~~ucted by ftlhe City) <br /> <br />B. Budget (budgeted item for 2005, & <br />2006) <br /> <br />Carry Over from 2004 <br />(Total Cost estimate -$23,353) <br /> <br />1. Install nets above backstop at Greenfield Park. B ($2,400) DO ~N <br />2(J)[)5) <br /> <br />2. Add more picnic tables at Hillview Park. Suggested during May 8, <br />2003 park tour. B ($2,500) TWO MORE 1 ABllE5l10 BIE <br />INSl ALlED ~~ 2(J)<<J)5 <br /> <br />3. <br /> <br />Resurface roller blade rink at Hillview Park. B ($6,000) DO iN 210105 <br /> <br />4. Replace picnic tables at Oakwood Park. B (One Table-$1 ,000) !DO <br />iN 2<<))05 <br /> <br />5. Install chain-link fence on west end of field for soccer play at <br />Oakwood Park. B ($500) DO IN 21005 <br /> <br />6. Replace doors on building at Random Park. B ($600) DO IN 20)(05 <br /> <br />7. Crack seal parking lot at Silver View Park. B ($1,520) (seal coat, <br />included@ $6,533.00) IOJO iN 2005 <br /> <br />8. Replace doors on shelter at Silver View Park. B ($800) !DO iN 2005 <br /> <br />9. Lambert Fence in front of team benches at Lambert Park. B <br />($1,500) lOOl ~N 2<<))05 <br /> <br />2005 <br />1. <br /> <br />(Total Cost estimate -$37,200) <br />Basketball Hoop of Greenfield Park: add to the court next to the <br />tennis courts. Suggested during May 8, 2003 park tour. B ($1,000) <br /> <br />2. <br /> <br />Basketball Court of Greenfield Park: look at resurfacing it. <br />Suggested during May 8, 2003 park tour. B ($1,700) <br />