My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 13-EDA-280
MoundsView
>
City Council
>
EDA
>
Resolutions
>
2013
>
Resolution 13-EDA-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:21:58 AM
Creation date
8/27/2013 2:57:10 PM
Metadata
Fields
Template:
MV EDA
EDA Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> CA'L <br /> 251 STARKEY ST. - P.O.BOX 7216 <br /> IF SAINT PAUL,MINNESOTA 55107 <br /> 0 <br /> 111 2•10 i� PH - <br /> ONE:(651)224-6299 FAX:(651)223 8197 <br /> & ONS CO. <br /> To: City of Mounds View <br /> Attn: Heidi Steinmetz <br /> Economic Development Specialist <br /> Bid Date: August 6, 2013 <br /> Project: Building Demolition and Site Restoration <br /> 2400 Co. Rd H2/2394 Co. Rd 10 Mounds View, MN <br /> Bolander submits pricing as follows: 2400 Site $68,218.00 <br /> Sign Demo $ 750.00 <br /> 2394 Site $18,714.00 <br /> Remove&fill sign foundation $ 500.00 <br /> Sections: E-mailed <br /> Drawings: E-mailed <br /> Addenda Acknowledged: None <br /> Inclusions: <br /> 1. Erosion control and NPDES permit <br /> 2. Complete structure demolition and disposal <br /> 3. City wrecking permit. <br /> 4. Water and sewer removals and disconnects. <br /> 5. Environmental Surveys. <br /> 6. Remove and dispose of the existing regulated waste. <br /> 7. Remove and dispose of the existing asphalt and curb. <br /> 8. Import and place 4 inches of topsoil,and seed. <br /> Exclusions: <br /> 1. Bond; add 1%If required <br /> 2. Testing,monitoring&inspections,survey, layout work <br /> 3. Engineering,design,preconstruction video and survey <br /> 4. Shoring, bracing,earth retention, underpinning <br /> 5. Asbestos/lead/chemicals/contaminated soils <br /> 6. Sealing of wells <br /> 7. Underground tanks <br /> 8. Removal or relocation of buried:debris, rubble,and/or obstructions not associated with the existing buildings <br /> 9. Dust/weather/safety barriers <br /> 10. Utility relocates/re-routes <br /> 11. Traffic control <br /> This proposal is subject to review by Bolander in 30 days. <br /> Thank you for the opportunity to bid this project. <br /> Yours truly, )/�' <br /> xi,,v„ LL <br /> lkil--g <br /> Evan Mackey <br /> Demolition Division Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.