My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8157
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
08000 - 08499 (2012-2016)
>
Resolution 8157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:09:03 AM
Creation date
9/24/2013 3:05:48 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WHEREAS,the Project is also eligible for funding from County State Aid Highway Funds <br /> as S.P. 062-610-003 (CSAH 10) and S.P 062-644-033 (CSAH 44)for reimbursement of County <br /> costs and for reimbursement of City costs as S.P. 146-228-007 (Red Oak Drive); and <br /> WHEREAS,plans for this Project, S.P. 062-610-003, S.P. 062-644-033and S.P. 146-228- <br /> 007, showing proposed traffic control system with Audible Pedestrian Stations ("APS"), Emergency <br /> Vehicle Preemption("EVP"), concrete walk and bituminous bike path for the improvement of <br /> County Road 10 at the intersection of Silver Lake Road/Red Oak Drive within the limits of the City <br /> as a Federally-assisted HSIP project have been presented to the City; and <br /> WHEREAS,the County will take bids for the Project,prepare an abstract of bids and cost <br /> participation summary,request the City's concurrence to award a contract, award a contract and pay <br /> the contractor from HSIP Funds, CSAH Funds and MSA Funds identified for the Project. <br /> NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AS FOLLOWS: <br /> 1. Prior to County award of a contract,the County shall first receive concurrence from the City <br /> for award of the contract to the lowest responsible bidder. <br /> 2. Upon award of a construction contract the County shall perform or contract the performance <br /> of the construction inspection including survey work. <br /> 3. All City-owned rights of way and easements within the limits of the Project for roads, <br /> utilities and stormwater are hereby granted to the County for Project use during construction. <br /> 4. The County and the City shall participate in the construction costs and engineering fees in <br /> accordance with the adopted Ramsey County Public Works Cost Participation Policy. <br /> 5. The estimated construction cost of items eligible for HSIP Funds is $387,383.51. Additional <br /> construction costs will be paid in accordance with the Ramsey County Public Works Cost <br /> Participation Policy. <br /> 6. Upon completion of the Project,the County shall own and maintain the storm sewer catch <br /> basins and leads on County roads and the City shall own and maintain the storm sewer trunk lines <br /> within the City. Laterals and drains servicing property within the City outside the road right of way <br /> shall also be owned and maintained by the City. <br /> 7. The City and the County shall maintain the traffic signals in accordance with Ramsey <br /> County/City of Mounds View Maintenance Agreement PW2013-08 for the intersection of County <br /> Road 10 and Silver Lake Road/Red Oak Drive. <br /> 8. After the application of HSIP Funds,the City shall reimburse the County 25%of the <br /> construction cost of the Traffic Control Signal System A. <br /> 9. After the application of HSIP Funds,the City shall reimburse the County 100% of the <br /> construction cost for two of six APS needed for Signal System A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.