Laserfiche WebLink
10. After the application of HSIP Funds the City shall reimburse the County 100%of the <br /> construction cost of the EVP. <br /> 11. After the application of HSIP Funds the City shall reimburse the County a prorated share of <br /> the construction cost of mobilization,traffic control and erosion control supervisor. <br /> 12. The City shall reimburse the County 100%of the construction cost for painted signal poles <br /> and bases. This was not included in the project bid and is included in Supplemental Agreement#1. <br /> 13. The City shall reimburse the County twelve percent(12%) of the construction costs (as <br /> determined by the low bid) of the City participating items prior to the application of HSIP Funds in <br /> accordance with the Ramsey County Public Works Cost Participation Policy as a construction <br /> engineering fee. <br /> 14. The City shall reimburse the County twelve percent(12%) of the design cost(as determined <br /> by the low bid) of the City participating items prior to the application of HSIP Funds in accordance <br /> with the Ramsey County Public Works Cost Participation Policy as a design engineering fee. <br /> 15. All City utilities or facilities modified or added to those provisions presently made in the <br /> plans and specifications may be incorporated in the construction contract by supplemental agreement <br /> and shall be paid for as specified in the supplemental agreement. Design and construction <br /> engineering fees will be paid according to paragraphs 13 and 14 above. <br /> 16. Quantity distributions identified above are shown in the Statement of Estimated Quantities in <br /> the plans. Estimated costs are identified in the Engineer's Estimates. Actual costs shall be based on <br /> the contractor's unit prices and the quantities constructed. <br /> 17. All liquidated damages assessed against the contractor in connection with the work <br /> performed on the Project shall result in a credit shared by the City and the County in the same <br /> proportion as their respective total share of construction costs to the total construction cost without <br /> deduction for liquidated damages. <br /> 18. The City shall not assess or otherwise recover any portion of its cost for this Project through <br /> levy on County-owned property. <br /> 19. The County shall, when a construction contract is proposed to be awarded,prepare a revised <br /> estimate and cost participation breakdown based on construction contract unit prices and submit a <br /> copy to the City. Upon concurrence to award a construction contract,the City agrees to advance to <br /> the Treasurer of Ramsey County an amount equal to the City's total construction cost share. <br /> 20. Upon substantial completion of the work,the County shall prepare a revised estimate of the <br /> cost participation breakdown based upon the contract unit prices and the actual units of work <br /> estimated to have been performed and submit a copy to the City. The construction engineering costs <br /> to be paid the County by the City shall be based on this estimated final construction cost. The <br /> County shall add to the City's estimated final construction costs the construction engineering costs, <br />