My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8157
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
08000 - 08499 (2012-2016)
>
Resolution 8157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:09:03 AM
Creation date
9/24/2013 3:05:48 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. After the application of HSIP Funds the City shall reimburse the County 100%of the <br /> construction cost of the EVP. <br /> 11. After the application of HSIP Funds the City shall reimburse the County a prorated share of <br /> the construction cost of mobilization,traffic control and erosion control supervisor. <br /> 12. The City shall reimburse the County 100%of the construction cost for painted signal poles <br /> and bases. This was not included in the project bid and is included in Supplemental Agreement#1. <br /> 13. The City shall reimburse the County twelve percent(12%) of the construction costs (as <br /> determined by the low bid) of the City participating items prior to the application of HSIP Funds in <br /> accordance with the Ramsey County Public Works Cost Participation Policy as a construction <br /> engineering fee. <br /> 14. The City shall reimburse the County twelve percent(12%) of the design cost(as determined <br /> by the low bid) of the City participating items prior to the application of HSIP Funds in accordance <br /> with the Ramsey County Public Works Cost Participation Policy as a design engineering fee. <br /> 15. All City utilities or facilities modified or added to those provisions presently made in the <br /> plans and specifications may be incorporated in the construction contract by supplemental agreement <br /> and shall be paid for as specified in the supplemental agreement. Design and construction <br /> engineering fees will be paid according to paragraphs 13 and 14 above. <br /> 16. Quantity distributions identified above are shown in the Statement of Estimated Quantities in <br /> the plans. Estimated costs are identified in the Engineer's Estimates. Actual costs shall be based on <br /> the contractor's unit prices and the quantities constructed. <br /> 17. All liquidated damages assessed against the contractor in connection with the work <br /> performed on the Project shall result in a credit shared by the City and the County in the same <br /> proportion as their respective total share of construction costs to the total construction cost without <br /> deduction for liquidated damages. <br /> 18. The City shall not assess or otherwise recover any portion of its cost for this Project through <br /> levy on County-owned property. <br /> 19. The County shall, when a construction contract is proposed to be awarded,prepare a revised <br /> estimate and cost participation breakdown based on construction contract unit prices and submit a <br /> copy to the City. Upon concurrence to award a construction contract,the City agrees to advance to <br /> the Treasurer of Ramsey County an amount equal to the City's total construction cost share. <br /> 20. Upon substantial completion of the work,the County shall prepare a revised estimate of the <br /> cost participation breakdown based upon the contract unit prices and the actual units of work <br /> estimated to have been performed and submit a copy to the City. The construction engineering costs <br /> to be paid the County by the City shall be based on this estimated final construction cost. The <br /> County shall add to the City's estimated final construction costs the construction engineering costs, <br />
The URL can be used to link to this page
Your browser does not support the video tag.