Laserfiche WebLink
ar,uiNr,uM i <br />fh� proposed budge[ brcai:down fnr the Muundn Vicw bike [r�il ttystFm reads <br />:�a fulluv�: <br />Sub grade prcparation - <br />Roll and grade 10,560 feet of linear trail <br />a. 200 haurs of ni�nual labor @ S7•02/hour = $1,404.00 * <br />b. ren[al of roller for 80 liours (� $10.00/hour = 800.00 * <br />c. EU hours field superviaion = 775.00 • <br />d. 120 hours af pTOgram adminis[rntion = 1,OSS.OQ • <br />$4,034.00 * <br />Bike trail way surface <br />a. 10,5G0 ft. of 2" Bituminous SurFace - 8' patli <br />@ $2.25/f[. _ $23,760.00 <br />b. 80 hours oi H c1J supervision = 775.00 * <br />c. 40 ho�rs of program administration 352.00 * <br />$24,887.00 <br />Slgnage and Painting . <br />a. 100 t�ours of manual labor @$7.02/hour = <br />b. 40 hours of Cleld supervision = <br />c. 40 Iiours of program administrntion = <br />d. trail way signagc 50 signs @$20.00 ea. <br />e. Paint supplies = <br />Y'otal budgered r.ost for compleled trail wny system <br />$ 702.00 * <br />388.00 * <br />176.00 * <br />1,000.00 * <br />493.00 * <br />$2,759.00 <br />$31,680.00 <br />•The City�of Moundti Vicw will be pnying tha starred items as their 25� share <br />ot the p[opo.ed projecC which Lutals $7,920.00. <br />