Laserfiche WebLink
piemo to Barry�Bauer Page 5��. . <br />AC this time [ite City would contrlbute $25,000.00 tmaard> the tennis court <br />construction wiCh the Schools underwr:iting the rem.ining $114,000.00. In <br />addition to tl�e C2ty's financial con[ribution the City would serve as the <br />genernl contractor and provide onsi[e inspections and in-house engineering needs. <br />There nre two major areas tf�a[ have not been addressed at this point: <br />1. Main[enance of [hz facility incluing mowing, breakdowns, fu[ure repaics <br />and general upkeep. . <br />2. Join[ powers agLeeaen[ outlining cost, time usage a�d general eontcol. <br />8oth of these issues should be dealt with in depth by a task foree established <br />through Community Education consisting of both City and School personnel. <br />In addition to the text portion of this report xe have included a variety of <br />brochures from different manufacturers outlining some of the possihle equipmznt <br />desig�s, atyles and costs in Addendum B. <br />An overview wncept plan caith facility locations can be found in Addendum C. <br />7.f you have 1ny questions con_erning thic proposal, feel frc:e to give me a <br />call a[ 784-3055. . <br />