Laserfiche WebLink
_ _4_ rwy io, iv�s � . <br />In addition to [he 'andividual park probleo� listed [he following should be <br />noted: <br />1. Oar park system is basically undeveloped at Chis point. <br />2, Many of ouz existing park sites have been built on low ground and <br />have been filled with street sweepings, i.e. Greenfield, Hillview, <br />Gmveland and Woodcrest. <br />3. We preaently do not have one hard coust os impervious surface in <br />our park system. Staff envisions a number of hard court aurfacea <br />in the future including, parking lots, tennis courts and multi- <br />purpoae areas. <br />4. The need for replacing our existing park shelter buildings is looming <br />larger each year which would increase the exiating runoff. <br />5. Staff aill be proposing an asphalt trail surface in the next 3 years <br />wnnecting the city's major shopping areas, achools and park areas. <br />6. There 3s a great need to enhance the aeathetic value of our existing <br />"open ditch" areas which I feel should be a concern of the storm <br />wa[er committee. <br />If you would llke additional informatioa or clarification on our exis[ing park <br />status, feel free to.give me a call. <br />