Laserfiche WebLink
-Z- <br />3. Lambert Tot Lot <br />a. The major stumbling block we have had with this project <br />is the re-location of the existing shelter building. <br />vur cime line now caiis ior 26e building to be moved <br />9/30/78. <br />b. The equipment has all been ordered and is ready for <br />installation. <br />c. This project is slated for completion by 10/13/78. <br />4. Pinewood Bal2fields, <br />a. The three fields have all been staked out and measured <br />in preparation of the initial cost. <br />b. One field was "skinned" on 9/27/78 with the remaining <br />two fields scheduled to be completed by 10/3/78. <br />c. The material from Pinewood will be used as top soil for <br />the Hillview Park skating area which will�be graded on <br />9/29/78. <br />5. Greenfield Hockey Rink <br />a. Staff has completed the preparation of specifications <br />for one hockey rink and lighting system for the City <br />Council's approval on 10/10/78. <br />b. This project will be commencing 10/23/78 and will be <br />ready for the 1978-79 skating season. <br />c. There is some questions concerning the development of <br />Northcrest Park which would mean this project could be <br />detained until 1979. Staff will explain further at <br />the meeting. � <br />�� <br />