Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />REVIEW SUPERVISOR FUNCTIONS <br /> <br />25 <br /> <br />Additional On-site Pre-election Training, <br />Testing, Site Surveys; maximwn 7 days <br />(Municipalities Staff & Polling Locations <br />- JunelJuly/August, 2002) <br /> <br />Includes review and <br />identification of the data transmission site in <br />each polling location or best alternative site, <br />performing modem testing from the polling <br />location and final testing of the transmission <br />of election results. <br /> <br />20 Poll Worker Training, Poll Workcr Manual, <br />Open/Close ~nstructions <br />In accordance with the training outlinc <br />shown below. <br />(Municipalitics Staff, Elcction <br />Judges - August, 2002) <br /> <br />On-site Election Day Covcrage per Contract <br />Covcrage for 2002 Countywide elections <br /> <br />Ejections JP A <br /> <br />$500/day <br /> <br />$500/day <br /> <br />10,000 <br /> <br />12,500 <br /> <br />$10,000 <br /> <br />10,000 <br /> <br />150[25 <br />