My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6652
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
06500 - 06999 (2005-2007)
>
Resolution 6652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:11:01 AM
Creation date
4/6/2007 10:42:24 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A1r- Greg Lee Frle 435-0.5-000 <br />lvtorurrls i~ietin, A9N October 5, ?00.5 <br />rYtectaorrics -Proposal for Utiliry~ Extension Report Page 2 <br />• <br />Scone Of Service$ <br />Based on the Project Understanding outlined above, and our review of the existing City sanitary <br />sewer and water distribution system maps, we have estimated the engineering services required <br />to analyze extension of the utility systems to the site. The scope of our proposed services is <br />outlined below. Separate sections have been provided for the sanitary sewer system, water <br />distribution system, and serrveying. <br />Sanitary Sewer S sy tein <br />Tasks that we propose to perform to analyze the extension of the sanitary sewer system include: <br />• Generate list of'data required from Developer for proper analysis. <br />• Attend kick-off meeting with City Staff, representative from the developer, and <br />representative from the consultant for the developer. <br />• Gather and review information on the existing City sanitary sewer system through <br />constnretion record plans or other sources. <br />• Establish design parameters for the City system extension, based on design flow design <br />flow data provided by the developer (See Developer Responsibilities.) <br />• Perform a capacity analysis of the existing City sanitary sewer system to accommodate <br />the anticipated design flows. <br />• Investigate up to two (2) altematives for sanitary sewer extension /layout for' the site, to <br />determine feasibility. <br />o Likely first alternative: Connection to City 18-inch diameter main on Jackson St. <br />o Likely second alternative: Corurection to MCES 30-inch line along north side of <br />Highway 10. Includes coordination /discussion with MCES. <br />• Develop feasible alternative(s): <br />o Preliminary design, including restoration of existing areas disturbed by <br />connection to and extension of sanitary sewer utility <br />o Prepare cost estimates associated with preliminary design <br />• Review costs with City to allow development of proposed financing. <br />• Provide fifteen {1 S) copies of a bound report to present the findings of the investigation. <br />Report would include: <br />o Narrative description of the project understanding, assumptions, investigation, <br />and findings. <br />o Cost estimates of the proposed altematives. <br />o Discussion on the proposed method of financing the improvements. <br />o Graphic figures showing the proposed altematives. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.