Laserfiche WebLink
N1r. Greg Lee File 435-0.5-000 <br />Mour:ds Vie,v, IvIN nctober S, 100.5 <br />Medti o~:ics - Prvposnl fog U~ilit~~ E.ttensiorr Report Pnge 3 <br />• <br />• <br />Water Distribution System <br />Tasks that we propose to perform to analyze the extension of the water distribution system <br />include: <br />• Generate list of data required from Developer for proper analysis. <br />• Attend kick-off meeting with City Staff, representative from the developer, and <br />representative from the consultant for the developer. <br />• Gather and review information on the existing City water distribution system tluough <br />construction record plans or other sources. <br />• Gather and review existing data on ground elevations and water use. <br />• Perform tluee (3) hydrant flow tests on the existing system to determine pressure and <br />flow characteristics in the area of the proposed extension. <br />• Review information froth hydrant flow tests on Blaine system. (Assumes tests perforned <br />by City of Blaine or others.) <br />• Establish design parameters for the City system extension, based on design flow design <br />flow data provided by the developer. (See Developer Responsibilities.) <br />• Investigate up to two (2) alternatives for water system extension /layout for the site, to <br />determine feasibility: <br />o Likely first alternative: Entire service provided by Mounds View distribution <br />system <br />o Likely second alternative: Domestic service provided by Mounds View <br />distribution system, fire service provided by Blaine distribution system. <br />• Develop feasible alternatives}: <br />o Preliminary design, including restoration of existing areas disturbed by <br />connection to and extension of the water utility <br />o Prepare cost estimates associated with preliminary design <br />• Review costs with City to allow development of proposed financing <br />• Provide fifteen (15) copies of a bound report to present the findings of the investigation. <br />Report would include: <br />o Narrative description of the project understanding, assumptions, <br />investigation, and findings. <br />o Cost estimates of the proposed alternatives. <br />o Discussion on the proposed method of financing the improvements. <br />o Graphic figures showing the proposed alternatives. <br />Preliminary Survey <br />• Perform direct survey ofoff--site areas where potential connection to and / or extension of <br />the sanitary sewer and water utilities would occur, to identify existing topographic <br />features that need to be accounted for in the preliminary design. <br />For ease of use of the City and for cast effectiveness, the findings of both the sanitary sewer <br />analysis and the water system analysis would be combined in a single bound report. <br />