Laserfiche WebLink
N1ovNns viEw <br />of Mounds view Staff <br />Item No: 9D <br />Meeting Date: November 13, 2017 <br />Type of Business: Council Business <br />Administrator Review: In )/ <br />To: Honorable Mayor and City Council <br />From: Don Peterson, Public Works Director <br />Item Title/Subject: Resolution 8858 Approving HVAC repairs at City Hall and the <br />Mounds View Community Center <br />Background: <br />The Public Works Department is responsible for the building Maintenance at all City facilities, this <br />includes the heating ventilation and air conditioning (HVAC) of the buildings. <br />At the Community Center a portion of the building is leased out for a child care operations, and <br />the City is responsible for the main components of this leased space. In 2014 the City upgraded <br />the roof top units (RTUs) over this area, as well as other portions of the building. After the RTUs <br />where installed and balanced it was discovered that the variable air volume systems (VAVs) were <br />never fully installed when the building remodel was completed between 1997 and 1998. The <br />tenant of the leased space has raised concerns over the past few years with the system and not <br />being able to provide adequate heat in the North West corner of the leased space. Staff has <br />worked with Trane Building Systems to find a solution to this problem. A wide variety of options <br />have been explored and the conclusion was to install a fully functioning electric reheat VAV for <br />this space. This VAV will add additional heat to the space when it is required. <br />Staff has received a quote from Trane Building Services to install this VAV for a total of $9,953.00. <br />Funding for this repair is budgeted in account 480-4180-7050. <br />Further Discussion: <br />The City Council is also considering upgrades to the CTV cameras and computer software. This <br />upgrade would move the majority of the equipment from the Audio/Video room to the Computer <br />room at City Hall. <br />The Audio/Video room temperature tends to be very warm especially in the summer months and <br />there is no way to adjust the system to allow for a more comfortable setting because of how the <br />heating/cooling system was installed in 2005/06*. Staff will be relocating much of the audio/video <br />equipment to the Computer room; this should allow the current VAV for the Audio/Video space to <br />adequately control the temperature. <br />Moving the audio/video equipment to the Computer room that contains servers and network <br />switches will create a temperature issue with this space <br />Staff requested a quote from Trane Building Services to install a mini -split unit for this space. A <br />small condensing unit will be placed on the inside wall of the police garage and a small wall unit <br />will be installed in the computer room and this equipment will allow for the temperature to be <br />controlled. Staff received a quote of $9,335.00 to install the unit from Trane Building services with <br />funding in account 480-4180-7050. <br />*The Mechanical contractor went bankrupt during the City Hall rehabilitation in 2005/06 and <br />therefore the issue was not resolved. <br />