Laserfiche WebLink
Item No: 9C <br />Meeting Date: November 27, 2017 <br />MOL__TNDS <br />VIEAT ype of Business: Council Business <br />L Administrator Review: <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Don Peterson, Public Works Director <br />Item Title/Subject: Resolution 8854, Accepting Improvements and Approve Final <br />Payment for CSAH 10 Trail Segments 6 & 11 <br />Discussion: <br />The City of Mounds View developed the County Road 10 (Mounds View Boulevard) Corridor <br />Improvement Program, which includes the development of a multi -use trail corridor along <br />County State Aid Highway 10 (CSAH 10). The original proposal had eleven trail segments <br />along this corridor. In 2007, trail segments 9-10 were constructed and in 2010 trail segments <br />1-5 were completed. <br />Trail segments 6 & 11 included the following: <br />1. Connection from the existing trail on the east side of Mounds View Boulevard at Silver <br />Lake Road to Groveland Road (Segment 6, amended scope). <br />2. Connection from the existing trail on the west side of Mounds View Boulevard north of <br />Moe's Sports Bar to County Road H2 (Segment 11). <br />3. Connection from County Road H2 to Woodale Drive on the west side of Mounds View <br />Boulevard (Segment 11). <br />City Council has taken the following steps in completing this project: <br />• May 26, 2015, Approve Resolution 8420 Authorizing Bolton & Menk, Inc. to Perform <br />Professional Engineering Design Services and Prepare Bidding Documents for CSAH <br />10 Trail Segments 6 &11. <br />• November 9, 2015, Approve Resolution 8478 Authorize Bolton & Menk, Inc. to <br />Proceed with Design for CSAH 10 Trail Segments 6 & 11. This resolution authorized <br />a reduction in the design scope of work for trail Segment 6 as well as eliminating a <br />trail leg at Edgewood Drive on the south side of CSAH 10 in order to improve <br />pedestrian safety. <br />• March 28, 2016, Approve Resolution 8539 Approving Plans and Specifications and <br />Authorizing Advertisement for Bids for CSAH 10 Trail Segments 6 & 11. <br />• May 9, 2016, Approve Resolution 8565 Approving a Construction Contract with <br />Northwest Asphalt for CSAH 10 Trail Segments 6 & 11. <br />• June 26, 2017, Approve Resolution 8779, Approving Reconstruction of County Road <br />H (County State Aid Highway 9) and County State Aid Highway 10 Trail Segments 6 <br />& 11 Cost Share Agreement with Ramsey County. <br />Northwest Asphalt, Inc. submitted the lowest responsible bid and awarded the construction <br />contract for the Project. Northwest Asphalt performed the construction of the trail segments <br />in the summer of 2016 and the project was substantially complete in the fall of 2016. <br />Northwest Asphalt has also completed the punch list and submitted all required project <br />documentation. <br />The City has been withholding 5% of the value of completed work, pending completion of the <br />punch list, verification of all the quantities, and providing all closeout documents. The <br />following table provides a summary of the total project cost. <br />