Laserfiche WebLink
TOTAL PROJECT COST <br />Did/Estimate <br />Final <br />Difference <br />Design &Inspection <br />Design <br />Bidding <br />Construction <br />Geotechnical Testing <br />$ <br />$ <br />$ <br />$ <br />77,668.00 <br />1,112.00 <br />43,552.00 <br />5,818.00 <br />$ <br />$ <br />$ <br />$ <br />69,947.00 <br />1,072.00 <br />29,000.00 <br />5,818.00 <br />$ (7,721.00) <br />$ (40.00) <br />$ (14,552.00) <br />$ - <br />Subtotal Design <br />$ <br />128,150.00 <br />$ <br />105, 837.00 <br />$ (22, 313.00) <br />Construction <br />Construction <br />$ <br />475,846.48 <br />Alternate Bid Item #1 - Lighting Extension <br />$ <br />89,101.80 <br />$ <br />564,948.28 <br />$ <br />529,955.93 <br />$ (34,992.35) <br />Contingency (5%) <br />Change Order 1 - Service Cabinet Rework <br />$ <br />$ <br />27,994.42 <br />1,938.00 <br />$ 27,994.42 <br />$ 1,938.00 <br />Subtotal Construction <br />$ <br />564, 948.28 <br />$ <br />559, 888.35 <br />$ (5,059.93) <br />TOTAL PROJECT COST <br />$ <br />693,098.28 <br />$ <br />665,725.35 <br />$ (27,372.93) <br />The project is approximately $27,000.00 under the estimated cost do to the savings on design <br />and construction observation professional services fees. <br />Recommendation: <br />Public Works recommends that the City Council adopt the attached resolution to accept the <br />construction work and final payment of $27,994.42 for the CSAH 10 Trail Segments 6 & 11 <br />from fund 420-4650-7050. (City Project No. 2015-0O3). <br />Respectfully submitted, <br />on <br />_rf— Public Works Director <br />