My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/12/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/12/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:40 PM
Creation date
2/27/2018 2:31:05 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/11/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
12/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
December 1, 2017 <br />Jon Sevald <br />Page 3 of 5 <br />Reference: Mounds View Comprehensive Plan <br />City Council's vision for the 2040 Plan. During this time, Stantec will evaluate the 2030 Plan <br />(including the Water Supply Plan) in conjunction with current Met Council requirements to <br />determine how much can be simply updated and what needs to be created anew. <br />Task 1: Project Initiation/Administration <br />• Meeting with City staff to discuss overall needs of the project. <br />• Assemble any additional base maps and previous studies. <br />• Create a Roles and Responsibilities document for the Comprehensive Plan Task Force. <br />• Project Admin - ongoing communication, preparing invoices and contract materials, <br />internal coordination, etc. <br />PHASE 2 ALTERNATIVES <br />Once the Task Force has drafted goals and policies and analysis has been completed for the <br />required elements, we will assist City staff in getting input on alternative scenarios. Stantec will <br />begin with attending a Task Force meeting and a meeting of the Parks Commission for initial <br />feedback, and then we will host an online survey and a community meeting to present the same <br />material - advertising and promoting these engagement opportunities will be the responsibility of <br />City staff. The input we receive will help to finalize the direction of the Comprehensive Plan. Each <br />of the content tasks below includes both mapping and writing for that topic. As I've mentioned, <br />we will not duplicate any mapping efforts that have been done recently under our existing <br />contract. <br />Task 2: Land Use <br />Task 3: Transportation <br />Task 4: Water (fee includes summary of technical water plans and is contingent on completion of <br />those plans) <br />Task 5: Parks <br />Task 6: Housing <br />Task 7: Implementation Plan <br />Task 8: Community Engagement <br />PHASE 3 COMPLETION <br />Once we have received input on alternatives and the analysis is completed, we will finish writing <br />the plan document. We will assist in preparing the final document for City staff to bring through <br />Design with community In mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.