Laserfiche WebLink
available for the splash pad. The Council has indicated the desire to have the splash pad and <br />playground installed and completed in 2018. <br />Staff has received a quote from Minnesota/Wisconsin Playground for the purchase and <br />installation of the playground, restroom/changing area, picnic tables, and benches and splash <br />pad components. The quote does not include the installation of the splash pad plumbing, <br />electric or running water and sewer to the site. <br />Following is the cost break down: <br />1) Splash Pad — components <br />2) Restroom/Changing area <br />3) Installing Building <br />4) Playing surface for splash pad <br />5) Installation of Playground equipment <br />6) 12" Compressed wood fiber for playground <br />7) Game time EWF base fabric <br />8) Game Time Geo Textile <br />9) Prepare site as needed, install concrete <br />10) Shade Canopies <br />11) Freight <br />Total <br />$178,649.00 <br />$32,844.00 <br />$25,327.00 <br />$6,118.00 <br />$53,402.00 <br />$5,618.00 <br />$2,185.00 <br />$1,878.00 <br />$64,253.00 <br />$11,250.00 <br />$11,738.57 <br />$393,262.57 <br />Minnesota/Wisconsin Playground is on the US Communities Government Purchasing <br />Alliance, (similar to the State Cooperative Venture) and has furnished and installed previous <br />playground equipment in Mounds View in a satisfactory manner. The 2018 adopted budget <br />includes $483,000 in fund 480-4470-7050 for Splash Pad City Hall Park redesign. <br />Staff is working to finalize cost for the installation of the Splash pad equipment as well as <br />running electric and water and sanitary sewer to the site; costs will be brought to the City <br />Council at a future meeting. <br />Recommendation: <br />Public Works Staff along with the Parks, Recreation and Forestry Commission is <br />recommending the City Council adopt attached resolution to accept quote #20632 from, <br />Minnesota Wisconsin playground for the installation of the playground equipment, rest <br />rooms/changing rooms, site preparation, installation of concrete and the purchase of the <br />splash pad components. For a total of $393,262.57, funded from account 480-4470-7050 with <br />a 2018 budget of $483,000 for Splash Pad. <br />Respectfully submitted, <br />Don Peterson, Public Works Director <br />