Services Request for Proposals and Authorize Advertisement. <br />• April 25, 2016, Approved Resolution 8561, Approve Consultant to Perform Design <br />Services Related to the Public Works Facility. <br />• May 9, 2016, Approved Resolution 8566, Declaring the Official Intent of the City of <br />Mounds View, Minnesota, to Reimburse Certain Capital Expenditures of a Project From <br />the Proceeds of Tax Exempt Bonds. <br />• July 11, 2016, Approved Resolution 8606, Approve Contract with American Engineering <br />Testing, Inc. to Provide Asbestos and Regulated Waste Inspection at the Public Works <br />Facility. <br />• July 25, 2016, Approved Resolution 8607, Approve Contract with WSB & Associates, <br />Inc. to Provide Geotechnical Services Related to the Public Works Facility. <br />• November 14, 2016, Held a Public Hearing and Approved Resolution 8658, Adopting a <br />Capital Improvement Plan and Giving Preliminary Approval to the Issuance of General <br />Obligation Capital Improvement Bonds. <br />• November 28, 2016, Approved Resolution 8669, Resolution Approving a Development <br />Review for 2466 Bronson Dr. (Public Works Facility Expansion). <br />• November 28, 2016, Approved Resolution 8670, Resolution Approving a CUP for Open <br />and Outdoor Storage as an Accessory Use for 2466 Bronson Dr. (Public Works Facility <br />Expansion). <br />• November 28, 2016, Approved Resolution 8671, Resolution Approving a CUP for the <br />Storage of Flammable Liquids over 800 Gallons Above Ground for 2466 Bronson Dr. <br />(Public Works Facility Expansion). <br />• January 9, 2017, Considering Resolution 8695 at tonight’s meeting, Authorizing Ehlers <br />& Associates, Inc. and Kennedy & Graven, Chartered to act as Financial Advisor and <br />Bond Counsel for the Issuance of General Obligation Capital Improvement Plan Bonds <br />for Financing the Construction of a Public Works Facility. <br /> <br />Staff and the consultant have reviewed the current estimate for the construction and it is <br />presented below. The Final Project Estimate is $6,900,198. The columns to the right show <br />previous estimates for comparison. <br /> <br /> <br />Additionally, there are deductive bid items that will be part of the project that will allow for a <br />reduction of the cost should the bids received be higher than estimated. These items will allow <br />the project to be awarded within the available funding. They are estimated to be approximately <br />Final Project <br />Estimate <br />Schematic <br />Design <br />Design <br />Development Cost Reduction <br />Main Building 4,430,912$ 4,490,767$ 4,805,431$ (374,520)$ <br />Site Work 871,145$ 880,618$ 927,269$ (56,124)$ <br />Auxillary Structures 352,125$ 347,397$ 347,397$ 4,728$ <br />Subtotal 5,654,182$ 5,718,782$ 6,080,097$ (425,915)$ <br />General Conditions*282,709$ 285,939$ 608,010$ (325,301)$ <br />Contingency **339,251$ 343,127$ 608,010$ (268,759)$ <br />Other Costs/Allowances 624,056$ 624,959$ 457,609$ 166,447$ <br />Total Project Estimate 6,900,198$ 6,972,807$ 7,753,725$ (780,918)$ <br />* General Conditions at 10% and reduced to 5% <br />** Contingency at 10% and reduced to 6% <br />TOTAL PROJECT ESTIMATE