My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/03/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/03/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:58 PM
Creation date
6/13/2018 4:10:06 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/14/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
3/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 07E <br />Meeting Date: March 14, 2016 <br />Type of Business: Council Business <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Director of Public Works/City Engineer <br />Item Title/Subject: Resolution 8533, Approve the Public Works Facility Design <br />Services Request for Proposals and Authorize Advertisement <br /> <br />Introduction <br />At their February 22, 2016 meeting the City Council accepted the Public Works Facility Space <br />Needs Study and directed staff to prepare a request for proposal (RFP) for design services for <br />constructing a new Public Works Facility. In addition, as part of the RFP, staff has provided <br />verbiage directing the consultant to include sustainable and energy saving technology and <br />features in the new facility. <br /> <br />Discussion <br />Staff has completed the RFP for design services and is requesting City Council approval. The <br />RFP includes several tasks that the consultant will be required to complete during the design <br />process. At each stage, a milestone meeting will be held to insure that the staff is in agreement <br />with the progress of the consultant. Staff will provide updates to the Council throughout this <br />process. In addition to design work, the consultant is directed to prepare cost estimates on <br />construction based on an estimated bid date of early 2017. <br /> <br />The initiation of the project with the consultant includes a review of the space needs study to <br />insure that the consultant is familiar with what is desired by the City of Mounds View. Since the <br />study provides several options, staff will work with the consultant on the preferred option for <br />design based on available funding for construction. <br /> <br />A tentative schedule has been laid out in the RFP and is shown below: <br />• March 14, 2016 – City Council approves the Request for Proposals (RPF) for <br />Design Services. <br />• March 15, 201 – Staff forwards the RFP to selected consultants. <br />• April 15, 2016 – Consultants return RFP to the City. Staff reviews and will make <br />a recommendation for award. <br />• May 9, 2016 – City Council approves selected consultant for award. <br />• May 16, 2016 – Kick off meeting with consultant. <br />• November 2016 – Design complete. <br />• December 2016 – Advertisement for bids for construction. <br />• Early 2017 – Award construction contract <br />• Late 2017 – Construction complete <br /> <br />It is possible some of the sustainable features (i.e. solar panels) may be installed at a later date. <br />This will be coordinated with separate contractors and funding for those features will be
The URL can be used to link to this page
Your browser does not support the video tag.