Laserfiche WebLink
Item No. 07G <br />Meeting Date: March 28, 2016 <br />Type of Business: CB <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8539, Approve Plans and Specifications and Authorize <br />Advertisement for Bids for CSAH 10 Trail Segments 6 and 11 <br /> <br />Background: <br />The City of Mounds View has been improving and adding to the trail system throughout the city. <br />As part of the 2016 – 2020 Five Year Financial Plan Mounds View included the construction of <br />County State Aid Highway 10 (CSAH 10) Trail Segments 6 & 11, City Project No. 2015-C03. <br /> <br />The City Council has taken the following steps, thus far, specific to CSAH 10 Trail Segments 6 <br />& 11: <br />• 05/26/15 – Authorized engineering design & preparation of bidding documents <br />(Resolution 8420) <br />• 11/09/15 – Authorized Bolton & Menk to proceed with the design (Resolution 8477) <br /> <br />Discussion: <br />Since the authorization of this project on May 26, 2015 Bolton & Menk , Inc. (BMI) has prepared <br />a design for use in soliciting public bids for constructing trail segments 6 and 11 along CSAH 10. <br />The design includes the construction of bituminous trail, lighting, and pedestrian ramps on the <br />east side of CSAH 10 from Red Oak Drive to Groveland Road (segment 6) and the west side of <br />CSAH 10 from north of Moe’s Sports Bar to Woodale Drive (segment 11). This design has been <br />reviewed by Ramsey County and at this point it is ready for advertisement. <br /> <br />The total project cost is shown below: <br /> <br />Engineer's <br />Estimate <br />Segment 6 138,736.00$ <br />Segment 11 265,399.00$ <br />Add Alt 1 99,393.00$ <br />Add Alt 2 7,845.00$ <br />Total Construction 511,373.00$ <br />Contingency (5%)25,568.65$ <br />Construction Admin (2.5%)12,784.33$ <br />Engineering Fee 122,332.00$ <br />Total Estimate 672,057.98$ <br />TOTAL PROJECT ESTIMATE <br />