<br />As part of the design process staff asked that BMI include two additional alternate bid items. <br />These are items that may or may not be included at the time of contract award and allow for the <br />possibility of additional amenities as funding permits. For this project the two alternates are: <br />1. Install lighting on existing trail from Edgewood Drive north to Long Lake Road. <br />2. Modify/remove existing trail crossings along Edgewood Drive to prevent possible driver <br />confusion due to two trail crossings in close proximity. <br /> <br />The next step in the project development of CSAH 10 Trail Segments 6 & 11 is the bid phase. <br />This involves advertising the project, distributing plans and specifications, answering questions, <br />and issuing clarifications for bidding requirements, reviewing and tabulating bids received and <br />making an award recommendation. BMI will provide assistance with this phase of the project. <br /> <br />If the attached resolution is adopted, bidding documents will be finalized and project advertised <br />in the official City newspaper (Sun Focus) and a regional trade publication for three weeks <br />before bid opening. A bid opening date of April 25, 2016 is proposed, with Council <br />consideration of award on May 9, 2016. Construction is anticipated to begin in the late spring ro <br />summer. <br /> <br />Recommendation: <br />Staff recommends that the City Council adopt the attached resolution approving bidding <br />documents and authorizing advertisement for bids for the CSAH 10 Trail Segments 6 & 11, City <br />Project No. 2015-C03. Doing so will allow the project to stay on track for a 2016 construction <br />schedule. <br /> <br />Respectfully Submitted, <br /> <br /> <br /> <br />Brian L. Erickson, P.E. <br />Director of Public Works/City Engineer <br />