Laserfiche WebLink
H:\MDVW\N15110431\1_Corres\C_To Others\Bid Results Letter.docx <br />May 4, 2016 <br />Brian Erickson <br />Director of Public Works/City Engineer <br />City of Mounds View <br />2401 County Road 10 <br />Mounds View, MN 55112 <br />Re:Bid Results <br />County 10 Trail Segments 6 & 11 <br />City Project No. 2015-C03 & 2015-C04 <br />BMI Project No. N15.110431 <br />Dear Mr. Erickson: <br />Bids for the County 10 Trail Segments 6 & 11 were opened on Tuesday, May 3, 2016. Five (5) bids were <br />received and a Bid Abstract has been included. <br />The following is a bid summary: <br />Alternate 1 is for the extension of trail lighting along a portion of existing trail from Trail Segment 11 to <br />Long Lake Road. Alternate 2 is for the removal of the duplicate crosswalk across Edgewood Drive on the <br />south side of County Highway 10. Work for both alternates would be outside of the existing right-of-way <br />and would require permission from the property owners. Based on the summary above, if the City Council <br />wishes to award the Project to the lowest bidder based on the Base Bid, or Base Bid and any combination <br />of Alternates, then Northwest Asphalt, Inc. should be awarded the Project . <br />If you have any questions, please feel free to contact me at (651) 728-3172. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Michael Warner, P.E. <br />Senior Project Engineer <br />Enclosure <br />Contractors Base Bid Alternate 1 Alternate 2 <br />Base Bid + <br />Alternate 1 + <br />Alternate 2 <br />1 Northwest Asphalt, Inc.$475,846.48 $89,101.80 $11,878.85 $576,827.13 <br />2 Sunram Construction, Inc.$485,927.00 $96,630.20 $11,863.75 $594,420.95 <br />3 Bituminous Roadways Inc.$509,756.50 $95,645.00 $12,279.50 $617,681.00 <br />4 Forest Lake Contracting, Inc. $521,973.00 $87,433.00 $16,265.00 $625,671.00 <br />5 Park Construction Company $526,028.40 $97,393.90 $13,884.50 $637,306.80