My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/03/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/03/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:00 PM
Creation date
6/14/2018 5:29:48 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/22/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
3/22/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.14;10. 1 i i inu VO:aa ra.. uZt 4 II) Ztau OtAti. <br /> ,594 MEMORANDUM <br /> 3535 VADNAIS CENTER DRIVE,200 SEH CENTER,ST.PAUL,MN 55110 851 490-2000 800 325-2055 651 490-2150 FAX <br /> TO: Mike Ulrich <br /> FROM: Rocky Keehn <br /> DATE: March 18, 1999 <br /> RE: Woodcrest Park Mitigation Site update <br /> SEH No. A-MOUND9901.00 <br /> Attached is the preliminary engineers estimate to construct the Mitigation Site at Woodcrest Park. <br /> This estimate is based on full site mitigation. The size and cost of the project will be reduced if the <br /> existing on site wetland area is increase by Ramsey SWCD (Tom Peterson). <br /> Several points to consider when reviewing this cost estimate: <br /> 1. There is extra wetland being constructed to be used for future projects or be transferred (sold) to <br /> another party for their wetland mitigation. <br /> 2. On-site removals are included. The City may wish to remove the play ground equipment, <br /> benches, building, and timbers prior to the excavation which will reduce the cost. <br /> 3. Concrete pipe was used. It may be possible to use CMP or HDPE pipe which will reduce the cost. <br /> 4. Excavation costs assumed that it will be hauled off-site. If a local deposal site is available the cost <br /> can be greatly reduced. <br /> 5. There is 15 percent contingency that may or may not be used depending on the final pond <br /> configuration. <br /> The final wetland boundary determination will need to be made this spring. I discussed this with <br /> Kelly Betendorf and she indicated that in about 2 weeks, if the weather holds, this issue can be <br /> resolved. I will contact Kate Drewry with RCWD and inform her that we would like to get this issue <br /> resolved as soon as possible. <br /> Once the final wetland boundary has been completed, we will finish the permit process and bid <br /> documents so the project can be advertised. The add for bid could be authorized at the second <br /> Council meeting in April and the award of the contract at the second Council meeting in May if all <br /> goes as scheduled. The construction time for the project should be about 2 weeks. <br /> If you have any other question please call be at 490-2026. <br /> RJK/rjk <br /> Attachment <br /> An Aliirmndre Action. <br /> Equal Opporn.niry Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.