Laserfiche WebLink
UJJ10'UN 111LI USS:D0 rA,i 001 4;111 ::170 ,S1 ki 411113 <br /> Woodcrest Mitigation Site <br /> Total <br /> Estimated Unit Estimated <br /> Item Unit Quantity Price Price <br /> Mobilization Lump Sum 1 $5,000.00 $5,000 <br /> Removals Lump Sum 1 $10,000.00 $10,000 <br /> Excavation cu yd 12,500 $6.00 $75,000 <br /> Class II for trail (6" deep, 8' wide) Tons 350 $15.00 $5,250 <br /> 24" RCP L.F. 88 $35.00 $3,080 <br /> 36" RCP L.F. 42 $75.00 $3,150 <br /> 42" RCP L.F. 47 $95.00 $4,465 <br /> 42" 7 1/2 degree bends Each 2 $1,000.00 $2,000 <br /> Ti" Apron and Trash Guard Each 6 $1,250.00 . $7,500 <br /> Salvage and Reinstall 36" Apron Each 2 $250.00 $500 <br /> Salva•e.and Reinstall 42" As ron Each 1 $300.00 $300 <br /> Skimmer Structure Lump Sum 1 $1,500.00 $1,500 <br /> Wetland Restoration acre 2.50 $3,000.00 $7,500 <br /> Non-wetland Restoration acre 0.60 $1,500.00 $900 <br /> Estimated Construction Cost $126,145 <br /> Contingencies (15%) $25,229 <br /> Total Construction $151,374 <br /> Engineering, Administation (15%) $22,706 <br /> Total Project Cost $174,100 <br /> Prepared by: RJK <br /> Reviewed by:MA <br /> 03/18/99 WOODEST.WK4 <br />