My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/02/01
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/02/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:12 PM
Creation date
6/14/2018 6:01:45 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/1/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
2/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Plan Option: <br /> - Addition to current building would include Community Education, Teen Center and <br /> Gymnasium. <br /> - Teen Center divided into two (2) areas, passive and active areas. Both areas open and <br /> visible from control desk. <br /> - Gym area visible from lobby/teen center through glass windows <br /> - Gym sized for basketball or two (2) volleyball courts. Bleacher viewing provided. <br /> - Some private, smaller room available for teens for conferences, meeting, movies, etc. <br /> - Lounge/cafe area provided. <br /> - Building set at angle to rest of facility to allow for better visibility. <br /> - An additional cost of approximately $200,000.00 will be required for this design. The <br /> costs is attributed to bringing the gym up to a City (government) standard versus that <br /> of a developer, lower end warehouse cost. <br /> The angle of the building was questioned; a building square (aligned) with the existing <br /> building was preferred. <br /> - Handicap parking, and parking distance for the seniors was a concern. <br /> - Control and security of the entrances was a concern. <br /> - Adequate storage should be provided. <br /> - Clearance space around the basketball court should be increased. <br /> - The facility needs to reflect the image of a community center. <br /> Follow-up: <br /> - A meeting with the Community Center Task Force needs to be scheduled. <br /> - City to look at its options with V.B. Diggs or other developers. <br /> - City to review their program needs for the Community Center. <br /> - CHS Daycare (Community Center Building, Phase 1) is scheduled for completion <br /> August 15, 1997. <br /> - Kitchen (Community Center Building, Phase 1) is scheduled for completion September <br /> 15, 1997. <br /> End of meeting. <br /> These meeting minutes as presented shall be regarded as accurate and correct, unless any <br /> discrepancies are provided to the author within five (5) working days of delivery. <br /> F:\WP W IN60\90634\CORRESP\MTGMIN8.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.