Laserfiche WebLink
Mr. Chuck Whiting <br /> Page 2 <br /> With respect to the alternates,a number of the items occur at the Teen Center/Lobby area. The <br /> a grant from the State for the Teen Center. The City may wish to allocate some of those funds towards these <br /> items to help reach the construction budget. City received <br /> -Alternate: Add operable folding partition walls and associated hardware in the Multi-Purpose <br /> Room A115 as indicated on drawing A4.1A. Structural supports to be included in base bid. <br /> -Alternate: <br /> Add interior gypsum board partition walls with doors and interior windows as <br /> -indicated on drawing A4.1B in Teen Rooms B112,B114 and Coat Room B 105B. <br /> Alternate: Add premanufactured modular skylights in Teen Center/Lobby Rooms B 102 B <br /> as indicated on drawing A2.2.- 113 <br /> Alternate: Add wall acoustical panels in Teen Center/Lobby Rooms B 102,B 104 B 113, and <br /> B116 as indicated on drawings. <br /> -Alternate: Provide premanufactured modular casework in lieu of custom casework as indicated <br /> on the drawings. <br /> -Alternate: Provide upper cabinets for all casework and associated undercounter lighting as <br /> indicated on drawings. <br /> -Alternate: Provide floor mounted toilet fixtures in lieu as indicated <br /> on mechanical drawings. of wall hung toilet fixtures <br /> -Alternate: Provide carpet and ceramic tile as indicated on drawing A11.1B in the Teen <br /> Center/Lobby Rooms B102,B104,B112,B113,B 114,B 116,in lieu of sealed exposed aggregate <br /> concrete floor. ggr gate <br /> Items that have been removed from the project because they were not identified in the original scope <br /> but were items that the Task Force thought they would like if budget allowed includes; the <br /> and volleyball courts,the exterior patio/sidewalk area to the courts,the display and kiosk cas kthe work, <br /> lobby area. exterior basketball <br /> casework in <br /> If directed these items could be included as alternates. <br /> In addition,the following items can be listed as alternates if directed by the City. <br /> The request for the heated sidewalk still needs to be addressed. The costs at present do not reflect <br /> This item may run approximately$25,000 to ?depending on extent of work required. Please advise as to the <br /> direction the City wishes to proceed with this matter, this item. <br /> Automatic facet and toilet flush valves are not provided under the base bid for the project. If the City would <br /> like to see this item included in the project an alternate could be created. <br /> J <br /> The Architectural fee for alternate work will be adjusted per Contract and Meeting Minutes,dated <br /> 1997. Alternates if not accepted at bid time require 80%of the architectural fee,if accepted they require <br /> 100%of the architectural fee. p April 21, <br /> Should you require any additional information or assistance,please contact me. <br /> Respectfully submitted, <br /> WAI/Continuum <br /> Dean A. Olsen,AIA <br /> Enclosure, 7 pages <br /> cc: Dave Wolterstorff <br />