My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-25-1997 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
1990-1999
>
1997
>
08-25-1997 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:16:03 AM
Creation date
6/15/2018 5:49:01 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
7/25/1997
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
7/25/1997
EDA Document Type
Council Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EDA Meeting#40 <br /> July 28, 1997 u <br /> Page 2 <br /> 1 Eastwood Road and Highway 10,and the house was demolished The city then proceeded to market the <br /> 2 property,attempting to obtain commercial development on the property. The city received no bids for the <br /> 3 property. The staff then went before Council,asking that a special:study be done of this property and <br /> 4 other properties in the area of Highway 10 to determine what types of uses were appmpriate given what <br /> 5 the market was seeking and possible restraints and opportunities with access points,the location adjacent <br /> • 6 to the highway,etc. This became known as the Area 9 Highway 10 Study. The study provided some <br /> 7 . recommendations as well as some discussion between the city and a developer who had been working in <br /> 8 the community;inthe past(MSP Real Estate). The recommendation from the consultant was for multi- ,1; <br /> 9 family development on the site. The proposalbeing considered for the site combinesthe three vacant <br /> 10 lots with the Red Oak Apartnpient development, It would include the addition of 16 rental townhomes and <br /> 11 the renovation of the Red Oak Apartments,operated as.one project. <br /> 12 a <br /> 13 Ms. Sheldon explained that at this time,the Red Oak Apartments are built at a density of 24.7 units/acre, <br /> 14 zoned R-4. The density on the apartment part of the project is higher than what would now be allowed R- <br /> 15 4 zoning(174,units/acre). If the new townhome project were combined with the Red Oak Apartments, <br /> 16 the overall density for the project would be reduced to 15 units/acre(due to the three vacant lots which <br /> 17 would be addled as a part oftheoverall development). Additionally the open space for each unit would <br /> 18 increase substantially. ..'She noted that one of the aspects of this project is that by combining all the land, <br /> 19 the end result is different than if the land is left as separate-lots. She noted that this development meets <br /> 20 the requirements for the building setback,parking lot,the lot width,the lot area,the building height,the <br /> 21 minimum floor area for each unit,and the open space requirements. Ms.Sheldon explained that the <br /> 22' developer asked the Planning Commission for a variance to put some of the parking spaces into"proof of <br /> 23 parking",which allows for more greenspace with a requirement that the applicant will build additional' <br /> 24 parking spaces if the city determines that more is needed. , <br /> 25 <br /> 26 Ms.Cathy Bennett,Economic Development Director,explained that MSP Real Estate is requesting that • <br /> 27 the EDA sell the corner lot for a purchase price of$1.35 per square foot. There is approximately 35,000 <br /> 28 square feet on the property for a total purchase price of$47,000. This is the same of ter they have given <br /> 29 the owners of the other twb vacant lots as part of the development. An appraisal was done on the vacant <br /> 30 lot and came in at$1.20 per square foot($42,000). When the EDA purchased the land in 1995,it was <br /> 31 purchased for$125,000 with a single family home that was in the process of beingconverted to a tri-plea: <br /> 32 . The property was deteriorating and after the city purchased it,it was demolished for.$6,000: The;initial <br /> 33 intention`was to redevelop the property for commercial ase. The city solicited requests for information to <br /> 34 25 local brokers and:the city did not receive any interest in redeveloping the area for commercial use. <br /> 35 .Some inquirieswere received but access was a critical part of their business and access was needed to <br /> 36 Highway 10. <br /> 37 <br /> 38 Ms.Bennett briefly went through the income qualification guidelines for the rental units as well as the <br /> 39 proposed rental rates for the development.- She explained that a total of ten units would be set aside as <br /> 40 Hoffman Units under the Holiman Consent Decree. The Silver Lake Commons development proposal, <br /> 41 includes an on-site management office. She stated she has spent time talking with the Management firm <br /> 42 that MSP Real Estatewould contractwith and has checked with'several references of properties that they <br /> 43 have managed,ail of which gave them excellent reports. <br /> 44 <br /> 45 Ms.Bennett stated staff is recommending approval of Resolution No 97-EDA-72. ; <br /> 46 <br /> 47 Milo Pinkerton of MSP Real Estate,stated originally their proposal included a total of 28 townhomes. <br /> 48 Their company met with the neighborhood on two separate occasions and reduced the number to 16,based <br /> 49. upon neighborhood input to not have;access on Eastwood Road. The problems of deferred Maintenance • •s. <br /> 50 at the Red Oak Apartments will be'corrected. Over$23,000 will be invested in each unit including a new <br /> 51 roof with dormers,new railings,vinyl siding,garages will be torn down,new asphalt paving,new <br /> 52 . carpeting,paint,kitchen cabinets,vinyl flooring,heating/air conditioning as necessary. Two play areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.