Laserfiche WebLink
I. <br /> di= <br /> 3535:VAONA'S CSVTER DRIVE 200 SEH CENTER,ST.PAUL.MN$5110 612 480.2000 800.325-2055 <br /> AR C Hl <br /> TECT'URE • ENGINEERING • ENVIRONMENTAL • TRANSPORTATION <br /> June 19, 1997 RE: Edgewood Avenue <br /> Highway 10 Intersection <br /> Mounds View,Minnesota <br /> SEH File No. P.MQUND9708,p0 <br /> Ms.Pamela Sheldon <br /> Community Development Director <br /> City Of Mounds View <br /> 2401 Highway 10 <br /> Mounds View,Minnesota 55111.1499 <br /> Dear Pam: <br /> As a continuation of our work with the proposed relocation of the Highway 10 and Edgewood Avenue Intersection, <br /> we propose the following work.program. <br /> Work Program <br /> •raffic volumes generated:I11y the proposed theater-will be forecasted and distributed to the new Highway 10 <br /> intersection and along the frontage road.This is necessary to provide volume information for both the design and <br /> analysisof the intersection`and the frontage road. <br /> Traffic volume infdrmationt will be obtained front M QT and the City.Volumes on Edgewood,on Highway 10 <br /> and at the intersection will be obtained.These will be utilized in conjunction with the theater forecast to develop <br /> "New Edgewood Avenue"traffic volumes. <br /> Using volume information obtained above,we will develop new turning movement counts for the intersection.These <br /> turning movement counts are necessary to provide a traffic signal analysis. <br /> Mn/DOT will be contacted and traffic signal coordination data for Highway 10.will.be.obtained. With this,, <br /> information,we Caninsert an additional traffic signal at Edgewood into the coordination scheme.It willbe necessary <br /> to review this for ASM peak hour,PM Peart hoar,and the off-peak periods.It may also-be necessary to review it for <br /> any special timing coordination that Mn/DO'1'uses.the impact of the new trafc signal will be evaluated._ <br /> Simultaneously,we will be refining the Edgewood Avenue alignment through the City Hallparking lot•The City <br /> should furnish us with parking lot plats Si)that we can be qty acct in our assessment of the tevistnns that will <br /> be necessary.At the same time,we-will coordinate access from the realigned Edgewood Avenue to cue-..,v.,,y fOrl.ital <br /> triangular piece of property to the east, and determine what access problems need to be resolved as part of the <br /> realignment. <br /> SHoRrEworr. <br /> Haw:m/01(8O1v INC. MINNEAPOLIS MN ST CLOUD Aav CHIPPEWA FALLS NI MADISON.Nl LAKE COUNTY,IN <br /> 501141,OPPORTUNITY e4PLQYER <br />