My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-1998 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
1990-1999
>
1998
>
09-14-1998 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:16:14 AM
Creation date
6/15/2018 6:54:29 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
9/14/1998
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
9/14/1998
EDA Document Type
Council Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> Examples of 10 such projects are included on the attachment further details can be provided when <br /> requested. <br /> OTHER HAZARDOUS MATERIALS <br /> Knowledge of state and federal environmental regulations and reporting requirements is essential <br /> � P g <br /> for providing environmental services in solid and ba7ardous waste management. PEER personnel <br /> understand state and federal requirements related to: <br /> • Lead Based Paint <br /> • Urea Formaldehyde Foam Insulation <br /> • Indoor Air Quality <br /> • Resource Conservation and Recovery Act(RCRA) <br /> • Comprehensive Environmental Response,Compensation and Liability Act(CERCLA) <br /> • Superfund Amendments and Reauthorization Act(SARA) <br /> • National Pollutant Discharge Elimination System(NPDES) <br /> • Underground Storage Tank(UST)regulations <br /> • Toxic Substances Control Act(TSCA) <br /> • Federal Insecticide,Fungicide,and Rodenticide Act(FIFRA) <br /> • Clean Air Act(CAA) <br /> • Clean Water Act(CWA) <br /> PEER's personnel have the experience and are knowledgeable in the current federal, state,and local <br /> Lead Based Paint regulations. PEER prides itself on keeping abreast of the continually changing <br /> regulatory environment. <br /> PEER's experienced personnel have managed lead based paint related projects from start to finish <br /> including: building surveys; development of O&M plans; preparation of bid specifications; acting <br /> as general contractor, selection of abatement subcontractors; preparation of State and Federal <br /> notifications; scheduling; abatement oversight; air monitoring; project documentation; and follow- <br /> up reporting. <br /> PEER has experience in RCRA compliance issues for Hazardous Waste Generators and <br /> Treatment, Storage and Disposal Facility Owners/Operators. Personnel have prepared and <br /> implemented RCRA Closure Plans and ground water monitoring plans. In addition,personnel have <br /> assisted facilities in obtaining RCRA Part B permits, identifying potential areas of non-compliance <br /> and developing plans to insure that RCRA compliance is maintained. <br />
The URL can be used to link to this page
Your browser does not support the video tag.