JAN-19-98 01 :05 PM WAI 612 223 5370 P. 02 <br /> Mr. Chuck Whiting <br /> RE: Mounds View Community Center <br /> Bel-Rae Ballroom <br /> Roof Issue <br /> Project #90634 <br /> Page 2 <br /> This glass may have cut the roof membrane. The exact location of these cuts would be very hard to lind. <br /> Water leakage from these cuts could be possible. The best solution to solve this problem was to replace the <br /> roof <br /> This information was discussed at length with all parties involved.It was decided that the roof should be <br /> replaced. Since Phase 2 of the construction included new rooftop equipment and accessories,the replacement <br /> of the roof should occur as part of this construction. The reroof of the existing building was incorporated into <br /> the Phase 2 construction documents. <br /> Per the direction of the City Council,no new Rinds would be available for this work. Therefore the new roof <br /> for the existing building must be funded out of the existing budget for the Phase 2 construction. If costs for <br /> the construction of Phase 2 appear to exceed the budgeted amount,alternates will need to be established and <br /> bid with the project. (Refer to attached meeting minutes.) <br /> Based on preliminary contractor price quotations,the project appears to be slightly over the projected budget. <br /> A preliminary list of alternates was submitted to the City on January 9, 1998 for review and comment. (Refer <br /> to attached letter,dated January 8, 1998. <br /> The information presented here represents the summation of events and dialogue on the existing roof at the <br /> Bel-Rae building.No explicit guarantee as to the water tightness of the existing roof was made. The existing <br /> roof was noted as"appeared in relatively good condition".Water damage was noted in the review of the <br /> interior of the building. The exact time when this damage occurred could not be determined. Since the City <br /> mould not provide any information to the contrary,the project proceeded without funds allocated for a new <br /> roof. <br /> Should you require any additional information or assistance,please contact me. <br /> Respectfully submitted, <br /> WAI/Continuum <br /> Dean A. Olsen,AIA <br /> Enclosures,6 pages <br /> cc: Dave Wolterstortf <br /> F;1966941CORRESP WHCRNO9 <br />