My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/04/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/04/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:17 PM
Creation date
6/18/2018 7:26:04 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/6/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
4/6/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Hall Wold Architects and Engineers <br /> Renovation Study November 3, 1997 <br /> • OPTION 5 - New City Hall Facility <br /> The final and most expensive option we have examined is simply to construct a new City Hall <br /> and Police Facility. There are many obvious benefits in the favor of this option, and some <br /> strong reasons why this may be unwise at this time. However, a new building could be built at <br /> any time in the near future and the decision to investigate this as a viable option would <br /> encourage the city to consider replacing only the three non-functional units at this time. We <br /> have included the cost of replacing these units, patching the roof over the 1974 and 1961 <br /> section of the building. In our analysis of the cost of constructing a new 20,000 sq. ft. building <br /> as needed immediate repairs while the City develops a new facility. <br /> Costs: <br /> HVAC Systems <br /> • Minimal repair or replacement of $ 33,000 <br /> non-functional units <br /> • Electrical $ 7,000 <br /> Construction Costs <br /> • 20,000 SF Facility $2,200,000 <br /> • Roof Patch $ 30.000 <br /> Factor for Contingency, Fee & Misc. Costs $2,270,000x 1.25 <br /> Total Option 5 $2,905,000* <br /> *This total does not include the costs for land purchases and site development. <br /> • <br /> Page 12 Commission No. 97102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.