Laserfiche WebLink
Mounds View City Hall Wold Architects and Engineers <br /> Renovation Study November 3, 1997 <br /> • OPTION 5 - New City Hall Facility <br /> The final and most expensive option we have examined is simply to construct a new City Hall <br /> and Police Facility. There are many obvious benefits in the favor of this option, and some <br /> strong reasons why this may be unwise at this time. However, a new building could be built at <br /> any time in the near future and the decision to investigate this as a viable option would <br /> encourage the city to consider replacing only the three non-functional units at this time. We <br /> have included the cost of replacing these units, patching the roof over the 1974 and 1961 <br /> section of the building. In our analysis of the cost of constructing a new 20,000 sq. ft. building <br /> as needed immediate repairs while the City develops a new facility. <br /> Costs: <br /> HVAC Systems <br /> • Minimal repair or replacement of $ 33,000 <br /> non-functional units <br /> • Electrical $ 7,000 <br /> Construction Costs <br /> • 20,000 SF Facility $2,200,000 <br /> • Roof Patch $ 30.000 <br /> Factor for Contingency, Fee & Misc. Costs $2,270,000x 1.25 <br /> Total Option 5 $2,905,000* <br /> *This total does not include the costs for land purchases and site development. <br /> • <br /> Page 12 Commission No. 97102 <br />