Laserfiche WebLink
Mounds View Cit Hall November 3, IVvi <br /> Renovation Study <br /> • <br /> OPTION 3 - Central Penthouse Unit <br /> the drawback of the central unit described in Option#2 above is the loss of floor <br /> Since majorpenthouse to <br /> propose to construct a penthouse at the rear of the <br /> space, we have included other options toexamine the costs of constructing a p s <br /> contain the new unit. In Option#3, we <br /> over the 1994 addition, directly behind the council chambers. This location seem <br /> building, both <br /> ' ble because it provides easy access for ductwork to owevere, nt his option we prove area vide <br /> 19des�ra <br /> only building <br /> te and e since construction of the penthouhe police areas of the 1961 se will require the removal of at least one <br /> only one alternative <br /> of the newer units. <br /> Costs: <br /> General Costs $ 105,000 <br /> • Roofing $ 4,000 <br /> • Tuckpointing $ 14,000 <br /> • Fire Protection UL <br /> HVAC Systems• 50 <br /> Replace Rooftop Units 1-4 & 8 $ 164,$ 4,9950 <br /> • Electrical <br /> • $ 7,500 <br /> Demo $_ <br /> • <br /> Construction of New Penthouse Space, <br /> Shafts and Louvers $ 366,700 <br /> Factor for Contingency, Fee & Misc. Costs x —28 <br /> $ 469,000 <br /> Total Option 3 <br /> I <br /> Page 8 Commission No. 97102 <br />