My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/11/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/11/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:55 PM
Creation date
6/18/2018 11:28:13 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/6/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
11/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 5034 • <br /> PAGE THREE OF FOUR <br /> 7. Upon completion of the project the County shall own and maintain the storm <br /> sewer catch basins and leads which directly serve the paved portion of Old Highway 8 and the <br /> City shall own and maintain the storm sewer trunk lines and storm sewer laterals servicing <br /> property outside the paved portion of Old Highway 8. The County shall own and maintain the <br /> storm sewer pond and wetland located on County open space. <br /> 8. After the final plans are submitted to the City, any utilities or facilities modified <br /> or added to those provisions made in the plans and specifications may be incorporated in the <br /> construction contract by supplemental agreement and shall be paid for as specified in the <br /> supplemental agreement. Design engineering and construction engineering fees shall be <br /> negotiated. <br /> 9. The City shall reimburse the County for actual engineering costs incurred on its <br /> share of project design and administration as a preliminary engineering fee. The City share shall <br /> be identified in partial cost estimates prepared by the County up to the time of contract award. <br /> The total preliminary engineering cost borne by the City shall not exceed 10% of its share of <br /> construction costs as determined at the time of contract award. <br /> 10. The City shall reimburse the Countyfor construction engineering costs for its <br /> share of construction costs as identified for each partial payment estimate up to and including <br /> final payment. The total construction engineering fee borne by the City shall not exceed 12%of <br /> its share of the construction costs as determined by final contract amounts. <br /> 11. Throughout the project design and construction, the County shall prepare partial <br /> cost and payment estimates for the preliminary engineering fees, construction costs, and <br /> construction engineering fees and, at appropriate intervals, notify the City of the costs for the <br /> City's items of work. The City shall pay its share of engineering fees and construction costs <br /> within twenty-one calendar days of receipt of County invoice. <br /> 12. All payments by the City shall be to the Treasurer of Ramsey County, Minnesota. <br /> 13. All monies paid by the City and not expended on the project will be returned <br /> within a reasonable time not to exceed two (2) years from deposit. <br /> 14. The City and the County agree to indemnify each other and hold each other <br /> harmless from any and all claims, causes of action, lawsuits,judgements, charges, demands, <br /> costs and expenses including, but not limited to, interest involved therein and attorneys' fees and <br /> costs and expenses connected therewith, arising out of or resulting from the failure of either party <br /> to satisfy the provisions of this agreement. Nothing in these provisions shall operate or be <br /> construed as a waiver of either party's statutory or common law immunities or limitations on 1110 <br /> liability. <br />
The URL can be used to link to this page
Your browser does not support the video tag.