My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/08/12
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/08/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:32 PM
Creation date
6/19/2018 6:16:26 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/12/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
8/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 • <br /> July 15, 1996 <br /> Mounds View City Council <br /> Mr.Ulrich explained that this was staffs recommendation or decision since the city was not paying for any <br /> bonds on the project. <br /> MOTION/SECOND: Blanchard/Trude to remove this item from the table. <br /> VOTE: 5 ayes 0 nays Motion Carried <br /> MOTION/SECOND: Hankner/Blanchard to approve Resolution 4962,Adopting the Assessment Roll for <br /> Public Improvements of Pleasantview Drive. <br /> VOTE: 5 ayes 0 nays Motion Carried <br /> B. Consideration of Bronson Drive Reconstruction Bids. <br /> Mr.Ulrich informed the Council that the bid opening for the reconstruction of Bronson Drive was held on <br /> July 8, 1996. A total of five contractors submitted bids. Three alternates were included in the bids. These <br /> alternates were based upon concerns expressed by affected residents as well as some of the Rice Creek <br /> Watershed District's issues. The alternatives include 1) piping of the North/South ditch at Belle Lane and <br /> Raymond; 2) cleaning and replacement of the storm sewer outlet pipe from the small holding pond4110 <br /> located North of Bronson Drive; 3) concrete aprons from the street to the sidewalk on the South side;and <br /> 4) utilization of poly pipe. <br /> Mr. Ulrich stated the lowest bidder was received from Forest Lake Contracting in the amount of <br /> $578,529.68 which included two of the alternates. The total project cost is estimated to be$759,320.21. <br /> Ms. Trude asked if the concerns expressed by a resident over the pond cleaning have been addressed in the <br /> contract. <br /> Mr.Ulrich stated that approximately 20 hours of equipment rental and manpower have been included to <br /> dig out a larger water surface area. <br /> Ms. Trude also asked whether the trees which need to be removed will be replaced. <br /> Mr. Barry Peters of Short-Elliott-Hendrickson, explained that the larger trees will have a 2 to 1 replacement <br /> on them. <br /> Mr. Ulrich stated that per State requirements,prior to their final plan approval,they will require a <br /> resolution stating that there will be no parking on the North side of Bronson Drive(as this will be a 32 foot <br /> road with parking on one side). <br /> MOTION/SECOND: Quick/Hankner to award the contract to Forest Lake Contracting,as per staff <br /> recommendation, in the amount of$578,529.68,including alternates for installing plastic pipe in place of <br /> the concrete and installing plastic pipe in the ditch. <br /> VOTE: 5 ayes 0 nays Motion Carried 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.