Laserfiche WebLink
:;`,r?' : REQUEST FOR COUNCIL CONSIDERATION Agenda Section 4. <br /> STAFF REPORT Report Number: 96-1624WS <br /> I 111 Olj If ii Report Date: 2/29/96 <br /> • <br /> WORKSESSION MEETING DATE <br /> ii Z''h March 4. 1996 <br /> f''mess.Partn¢t''1' <br /> Item Description: Update of Old Highway 8 Reconstruction <br /> Administrator's Review/Recommendation: <br /> -No Comments to supplement this report X <br /> -Comments attached. <br /> Explanation/Summary(attach supplement sheets as necessary) <br /> Summary: <br /> Ramsey County representatives and staff conducted a neighborhood informational meeting on February 22, <br /> 1996 to discuss and share several design options regarding the reconstruction of Old Highway 8. Three <br /> options were presented. <br /> The first design option included a four-lane highway the entire length of the project. An eight (8) foot a <br /> bituminous path was also included, to be constructed on the west side of the highway throughout the entire <br /> length of the project. Acquisition of additional Right-of-Way is necessary at the Motel property and at 4949 <br /> Old Highway 8. The acquisition of property from the Motel could be relatively easily acquired. The property <br /> 0 owned by Ms. Matelsky (4949 Old Hwy 8) would be highly impacted by this construction design. The path <br /> would literally extend through the corner of the house. <br /> The second design option provided for a path the entire length of the project, and included a two-lane traffic <br /> design. This option lessened the additional Right-of-Way requirement of both properties, but still significantly <br /> impacted Ms. Matelsky. The distance between the path and the house was approximately eleven(11)feet. <br /> The last option presented which was highly endorsed by both the county design and traffic engineers, is a two- <br /> lane road with a right bypass lane constructed at the entrance of the manufactured home park. This plan also <br /> included path construction. Additional Right-of-Way is still necessary at the Motel and the Matelsky residence. <br /> The distance between the path and corner of the house in this design was estimated at four(4) feet. <br /> Additional Right-of-Way for this project as all County projects is the responsibility of the City. Even if the <br /> path were not included in the construction, the City would be responsible for some ROW from the Matesky <br /> property. It seems at this point it consideration should be given to purchase the Matesky property and proceed <br /> with plans for constructing a newly improved roadway that will adequately serve the needs for future motoring <br /> public, pedestrians, and cyclists. <br /> Ramsey County representatives will be in attendance at the work session to further explain this project and the <br /> options.. <br /> If Council has any questions or concerns that staff can forward to Ramsey County prior to the meeting, please <br /> 0 <br /> feel fee.ta call me. <br /> /ice <br /> X, <br /> Michael Ulrich, Director of Public Works <br />