The second plan shows the community center at full programmed areas. Included in this option are <br /> areas for the following: Teen Activities/Lounge; Seniors; Community Education; Children's <br /> Education; Classrooms; Dance Floor; CHS Daycare; Volleyball Courts; Gymnasium. <br /> The following items are related to the development of this plan: <br /> - The addition of a four(4) court Volleyball building with support spaces <br /> - The addition of a multi purpose Gymnasium <br /> - The relocation of the Teen Activity/Lounge areas to the new building <br /> -Expansion of the existing parking lot <br /> - The relocation of the CHS Daycare and the children's educational areas. This cost should <br /> be very minimal, since these spaces were designed to be interchangeable in the previous <br /> option. <br /> - The addition of a new main entry and drop off area to the facility. <br /> The work completed in the first phase serves as the basis for the following phase. The final phase <br /> allows the project to grow to its full development. With respect to the plans and placement of areas <br /> the following should be noted: <br /> - The relocation of the Teen Center allows for a centralized activity area, adjacent to other <br /> 410 <br /> activity areas. <br /> -The relocation of the Daycare allows for a private area away from the major activity areas. <br /> - The relocation of the Educational areas allows for these areas to be adjacent to the major <br /> entrances and direct access to the users and neighborhood residents. <br /> - The dance floor area is increased with the relocation of the teen center. <br /> After the plan options were presented, a discussion was held regarding the requirements and concerns <br /> of CHS. The following items should be noted: <br /> - The daycare should be located in the corner of the building (as indicated in plan option 2) <br /> at this time to eliminate any associated moving and relocation costs in the future. <br /> -Restrooms should be added to the classrooms for student comfort and security, eliminating <br /> any interaction with outsiders at a public restroom. <br /> -Area required for each student shall be 35 square feet minimum. Additional area would be <br /> preferred, approximately 45 square feet per student. <br /> - The daycare needs to be operational by June 1, 1997. Completion of construction should <br /> be approximately May 15, 1997. Estimated construction timeframe is approximately three <br /> (3) months. All decisions, planning and construction drawings need to be completed by <br /> February, 1997. <br /> - The daycare will be sized for approximately 90-100 students. <br /> - The daycare will need to have a fire sprinkler installed. Sprinidering of the entire building <br /> is requested by the City. Verification of water service to the facility will be required. <br /> Installation of the sprinkler may be done in phases, depending on construction sequencing. <br /> Consulting engineers for the city is SEH, 490-2000. Point of contact at the city is Jim Hess. <br />