My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/08/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/08/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:27 PM
Creation date
6/19/2018 11:40:23 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/8/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
8/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7H <br />Meeting Date: August 8, 2016 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8613, Approve Replacement of Two Existing Hydrants <br />on County Road H in Conjunction with Ramsey County’s Project <br />Introduction: <br />The Ramsey County’s reconstruction of the I-35W and County Road H project is well underway. As <br />construction has progressed at the intersection of Mounds View Boulevard and County Road H, it <br />was discovered that two hydrants would be in the street or curb of the new roadway. As a result they <br />need to be relocated further north in the county right of way. Unfortunately, this was not included as <br />part of the design, so Public Works staff has been working with Ramsey County to resolve this <br />situation. <br /> <br />Discussion: <br />With the need to relocate these hydrants, staff reviewed the condition of the hydrants. It was <br />determined that replacing them would be appropriate as they are approximately 50 years old. Since <br />the contractor is responsible for relocating them the City would only need to purchase the new <br />hydrants and isolation valves. It was decided that the City would provide the necessary material; <br />however, the contractor will be responsible for the labor costs. Some other minor costs such as <br />additional piping will be covered under the construction costs as well. <br /> <br />Staff requested a quote from Ferguson Waterworks for providing the necessary material. The <br />material would include two new hydrants, isolation valves for each hydrant, and necessary fittings <br />to make all the appropriate connections. The estimated cost is $11,111.51. This cost is not in the <br />2016 Water Budget; however, there is a line item for gate valve replacement in the amount of <br />$15,000.00. No gate valves are scheduled for replacement at this time and thus funding could <br />come from 700-4823-7030. <br /> <br />Recommendation: <br />Staff recommends the Council approve the quote from Ferguson Waterworks for the purchase of <br />the hydrants, pipe, valves and fittings in the amount of $11,111.51. Funding to come from 700- <br />4823-7030. Staff also requests a contingency of 10% or $1,111.00 for unforeseen expenses <br />during the installation of the hydrants. Total not to exceed 12,222.51. <br /> <br />Respectfully Submitted, <br /> <br /> <br /> <br />Brian L. Erickson, P.E. <br />Director of Public Works/City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.