My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/11/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/11/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:08 PM
Creation date
6/19/2018 12:11:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/14/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
11/14/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />The construction contract is based on line item bids and as the Project progressed the quantities <br />could be over or under the estimate. In the case of this Project the largest line item that was <br />under the estimated quantity was Class II Rip Rap which resulted in a savings of $32,115. <br />Numerous other line items were under run as well thus resulting in a cost savings of $60,823.87 <br />from the awarded contract price. Overall the project was approximately $65,000 under the <br />estimate. This savings may be reduced slightly, as there will be one final invoice from Stantec <br />as part of the close out process. <br /> <br />Recommendation: <br />Public Works recommends that the City Council adopt the attached resolution to accept the <br />construction work and approve final payment of $27,039.71 for the Mustang Drive Pavement <br />Rehabilitation and Drainage Improvement Project (City Project No. 2014-C01). <br /> <br /> <br />Respectfully submitted, <br /> <br /> <br />Brian Erickson – Public Works Director/City Engineer <br />Bid/Estimate Final Difference <br />Design & Inspection <br /> Design/Special Assessments 45,650.00$ 39,297.09$ (6,352.91)$ <br /> Bidding 2,250.00$ 1,531.20$ (718.80)$ <br /> Construction 20,000.00$ 23,405.50$ 3,405.50$ <br />Geotechnical Evaluation 5,237.00$ 5,227.75$ (9.25)$ <br />Total Design 73,137.00$ 69,461.54$ (3,675.46)$ <br />Construction 433,916.56$ 373,092.69$ (60,823.87)$ <br />TOTAL PROJECT COST 507,053.56$ 442,554.23$ (64,499.33)$ <br />TOTAL PROJECT COST
The URL can be used to link to this page
Your browser does not support the video tag.