Laserfiche WebLink
Item No. 07D <br />Meeting Date: August 24, 2015 <br />Type of Business: CB <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Public Works Director/City Engineer <br /> Brandon Stenglein, Project Coordinator <br />Item Title/Subject: Resolution 8447, Municipal Consent for Ramsey County <br />Road 10, County Road H and I-35 W Interchange Project <br /> <br />Introduction <br />Ramsey County is in the process of a significant improvement program along the I-35W corridor <br />in the 2015 and 2016 construction seasons. For Mounds View, the improvements planned for <br />County Road 10, County Road H and I-35W will have the largest impact going forward. <br />Throughout the planning and design phase Mounds View has been included in the process as a <br />member of the Project Management Team (PMT). The PMT also includes technical staff from <br />Mn/DOT, FHWA, Arden Hills, Metro Transit, RCWD and several engineering consultants. <br /> <br />Background <br />At the Work Session on December 1, 2014, Beth Engum, Ramsey County’s Project Manager <br />along with the previous Public Works Director, Nick DeBar, discussed the extent of this project. <br />During that discussion, Ms. Engum provided the Council with an overview of the planned <br />improvements including updates on Highway 96, TCAAP infrastructure improvements and the <br />Rice Creek re-meander project. On April 6, 2015, Ramsey County returned to Council to <br />discuss the layout that was prepared. At the August 3, 2015 Work Session, Ms. Engum <br />provided a revised design layout for the project which was well received by City Council. This <br />revision was made in order to address concerns from local business regarding the proposed <br />closure of Clifton Drive to left turns out onto County Road H. <br /> <br />The final layout for this project has been refined based on input from the City and business <br />owners. This final layout is in the Mn/DOT approval process and this revision includes <br />roundabouts on both the east and west sides of I-35W. The western roundabout provides a <br />solution which allows for access to I-35W without requiring a difficult u-turn. <br /> <br />A preliminary budget estimate has been prepared for the work that is planned as part of this <br />project. As stated during the August Work Session, a portion of the work will be the <br />responsibility of the City of Mounds View. These costs include: trail, stormwater management, <br />and city portion of the traffic control and mobilization. The final two costs are typically items that <br />a spread across the total contract. One additional cost that has been avoided is the need to <br />contribute to bridge aesthetics. A cost breakdown for estimated city costs is shown below: